FIR16-00707
| INSP-Sprinkler Rough-in/Hydro | 3/8/2017 | 3/9/2017 | 3/9/2017 2:38:51 PM | P | PART |
|
|
Rough to cover inspection compete for overhead fire sprinkler piping on level 2 and level 1 entry by escalators, approved for cover. Hydro will be completed at a later date.
|
FIR14-00887
| INSP-Final Inspection | 3/9/2017 | 3/9/2017 | 3/9/2017 1:28:56 PM | P | PASS |
|
|
Final undergeound inspection passed/complete
|
FIR16-00511
| INSP-Sprinkler Rough-in/Hydro | 3/9/2017 | 3/9/2017 | 3/9/2017 12:14:56 PM | P | PASS |
|
|
3rd Floor hydrostatic test complete
|