Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR16-00344 INSP-Sprinkler Rough-in/Hydro8/4/20168/4/20168/4/2016 3:38:30 PMPPART
24 hour air test started at 3:00 pm.
BLD16-01581 FIRE-Final Inspection8/4/20168/4/20168/4/2016 3:18:49 PMPPASS
Fire sprinkler inspection complete, fire alarm inspection complete, maglock release tested with fire alarm activation, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
FIR16-00365 INSP-Final Inspection8/4/20168/4/20168/4/2016 3:17:23 PMPPASS
Final fire sprinkler inspection passed/complete
FIR16-00075 INSP-Final Inspection8/3/20168/4/20168/4/2016 3:16:50 PMPPASS
Final fire sprinkler inspection complete for level 9.
BLD15-02368 FIRE-Final Inspection8/3/20168/4/20168/4/2016 3:16:04 PMAPART
Fire sprinkler inspections have been completed for TI section of levels 5, 6, 7, and 8. Fire alarm inspection for audio visual devices (floor above and floor below alarm notification has been tested and is satisfactory, level 4 has core and shell audio visual, no tenant improvement visuals at time of this inspection) have been completed on TI section of levels 5, 6, 7, and 8, in-duct detectors will need to be tested when the post fire smoke evacuation system is completed. Fire extinguishers are in place on levels 5, 6, 7, and 8, some of the fire extinguishers need to be inspected and tagged, fire extinguisher tags will be verified during final inspection at completion of entire project. Life fire safety inspection complete for TI levels 5, 6, 7 and 8 with exception to the fire extinguisher inspection tags and post fire smoke evacuation system.
FIR14-00887 INSP-Sprinkler Rough-in8/4/20168/4/20168/4/2016 11:09:36 AMPPART
Rough to cover inspection complete for overhead fire sprinkler piping located on level 3, level 3 overhead fire sprinkler piping approved for cover.
FIR16-00338 INSP-Final Inspection8/3/20168/4/20168/4/2016 10:23:44 AMAPASS
Final commercial hood fire suppression system inspection passed/complete.
BLD16-00920 FIRE-Final Inspection8/3/20168/4/20168/4/2016 9:52:02 AMAPASS
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher is in common area with current inspection tag. Noted that the office doors on mezzanine have thumbturn deadbolts installed on doors for security, door handles are paddle type door hardware. Final life fire safety inspection passed/complete.
BLD15-01619 FIRE-Final Inspection8/3/20168/4/20168/4/2016 9:48:54 AMAPASS
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher is in place with current inspection tag. Final life fire safety inspection passed/complete.
FIR16-00428 INSP-Final Inspection8/4/20168/4/20168/4/2016 9:31:40 AMAPASS
Final fire sprinkler inspection passed/complete
FIR15-00329 INSP-Final Inspection8/4/20168/4/20168/4/2016 5:21:20 AMAPASS
Final underground inspection passed/complete
FIR15-00329 INSP-Supply line flush8/3/20168/4/20168/4/2016 5:19:46 AMADONE
North main line flush completed after PIV relocation.