(MICRON SUBSTATION) The project is to provide a design for the preferred and alternate 12kV feeders from the Micron DRAM Substation to the Building 51 and 51X S&C ATSs as well as the installation of a Power Quality Industrial Voltage Restorer (PQ IVR) on each of the preferred feeders and any other 12kV feeder reconnections and demolition necessary to remove Building 51 from the Building 50 12kV feeders. Design will incorporate the installation of a transformer yard, switch gear, current reactors, harmonic filter, associated monitoring, alarming, network, phone, required duct banks, equipment pads and containment. Design for the area will require storm water considerations, approximately 4ft high retaining wall, and roadway access/modifications to provide truck access to the site. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Concrete1/21/20201/21/20201/21/2020ADONE
DetailsJim Storey
please call 1/2 hour ahead , meet B26 lobby. This inspection is for structural with the 3rd party reports done by MTI for Quality electric. To cover structural sign off on BLD. Phone #: ###-#### Inspection requested via web by Daniel Cook
DOC - Permit Finaled1/21/20201/21/20201/21/2020PPASS
DetailsJim Storey
si on file w/mti
BLD-Final1/21/20201/21/20201/21/2020APASS
DetailsJim Storey
please call 1/2 hour ahead , meet B26 lobby. This inspection is for structural with the 3rd party reports done by MTI for Quality electric. To cover structural sign off on BLD. Phone #: ###-#### Inspection requested via web by Daniel Cook
BLD-Conference4/3/20194/3/20194/3/2019APEND
DetailsJim Storey
no ele permit atched/ no bld insp.//Expires: 08/28/19
Fees Due Hold9/28/2018 12/27/2018 DONE
DetailsTisha Gallop
(F) Reprint permit  8/29/2018 DONE
Issue & PRINT to be Invoiced  8/28/2018 DONE
Plan assigned to (CDM)7/4/20187/4/20187/30/2018 PASS
DetailsCarl D Madsen
Micron Sub-Staion
Routing - FIRE7/4/20187/4/20187/30/2018 PASS
DetailsErika Akin
No new structure or change to exisitng access. No comments attached.
1st review completed  7/30/2018 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/30/2018 DONE
Permit Ready to Issue  7/30/2018 DONE
NEED
GC form - met
Revised Cert of value
Routing PW Environmental7/5/2018 7/19/2018 PASS
DetailsTerry Alber
All electrical. No Pretreatment comments.
Routing - ELECTRICAL7/4/2018 7/12/2018 PASS
DetailsDaryl DeGrange
Routing PW Street Lights7/5/2018 7/9/2018 PASS
DetailsTom Marshall
Routing - PUBLIC WORKS7/4/2018 7/5/2018 PASS
DetailsMorgan Webb
Routing - Addressing7/4/2018 7/5/2018 PASS
DetailsDoug Chausow
Routing PW Drainage7/5/2018 7/5/2018 PASS
DetailsBrian Murphy
Routing - PLAN CHECK7/4/2018 7/4/2018 PASS
DetailsCarl D Madsen
Intake Approval  7/4/2018 PASS
Intake Approval  6/19/2018 FAIL
DetailsMichael Hanson
This permit has failed prescreen due to the following:
1. Provide completed and signed #502 checklist
2. Completed and signed #304 form
Application received  6/11/2018 DONE
Application submitted via PDS Online on Jun 11 2018 11:43AM