Information based on query as of Thursday, March 28, 2024.
Permit NumberMEC18-05917
StatusFinaled
Name PAIGE MECHANICAL GROUP INC
Site Address 711 N CURTIS RD
Project Name 
Customer Number18.7144.23
ePlanReviewNo
Description
New: Install HVAC Equipment, Gas Piping, Condensate, Duct, Trim, & Isulation
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  5/7/2020 DONE
2nd notice
Print Statement  4/13/2020 DONE
1st statement
First Notice7/22/20197/22/20193/11/2020 DONE
DetailsBrian Scoles
This permit finaled on the web by Nicholas Paige
Print Statement  2/26/2020 DONE
Final7/22/20197/22/20197/22/2019PPASS
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- final ok- card signed
Final7/15/20197/17/20197/17/2019APART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- need air balance report on all hoods- need all equipment set into final place- need drip pans installed on north hood- need ss panel installed on deep fryer thats 18 inches higher open flame- went over with Dru, John and GC onsite- rest is good- temperature test pass above ceiling
Conference7/17/20197/17/20197/17/2019ADONE
DetailsChad Schwendiman
11:00
Final7/10/20197/11/20197/11/2019PPART
DetailsBrian Scoles
partial final Phone #: ###-#### Inspection requested via web by Nicholas Paige- need to set up above ceiling temp test- need all appliances under class 1 hood set into place and flex gas piping hooked up- walked rest of job all good- few items for final
Final7/3/20197/8/20197/8/2019APART
DetailsBrian Scoles
part final on gas and condensate Phone #: ###-#### Inspection requested via web by Nicholas Paige- need drip legs between shut off valves and appliances 4 locations on cook line- need to seal exterior penetration weather tight at gas meter location- need to reroute condensate drain on roof blocking door access to unit- went over with Ryan onsite about issues- need mech permit issued from company who installed 2 class 1 hoods and dishwasher hood talked to general contractor about this
Rough-in6/14/20196/14/20196/14/2019PPASS
DetailsBrian Scoles
please call dru prior to arriving Phone #: ###-#### Inspection requested via web by Nicholas Paige- R/I on area H1and H2 ok- ok for ceiling tiles- need to walk roof and all areas for fire damper labels on grid- will need to verify tempature test for above grid by final
Rough-in6/6/20196/7/20196/7/2019APART
DetailsBrian Scoles
cover and fire damper Phone #: ###-#### Inspection requested via web by Nicholas Paige- area H1 and H2 fire damper angles and labeling on doors ok- grid 16 to grid 11 seal, registers and flex ok, ok for ceiling tiles
Rough-in6/3/20196/3/20196/3/2019PPASS
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- area E to grid line 16 registers flex and labeling on fire damper doors ok- ok for ceiling tiles- still need labeling on grid all areas
Rough-in5/20/20195/21/20195/21/2019APART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- area 1 entry ok to cover registers and flex ok- area 3 mini split cassette ok to cover pending condensate hook up in area 3 entry- talked to Dru about this onsite
Rough-in5/14/20195/15/20195/15/2019APASS
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- area 2 C & D registers, seal and flex ok- ok for ceiling tiles
Rough-in5/7/20195/7/20195/7/2019PPASS
DetailsChad Schwendiman
hardlid Phone #: ###-#### Inspection requested via web by Nicholas Paige - Okay to cover hard lids in rooms 431, 432, 433, 602, 603
Rough-in4/29/20194/30/20194/30/2019APART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- area E fire damper angles ok- area H1 and H2 seal on supply, return and exhaust ok excluding hard lid areas
Rough-in4/26/20194/29/20194/29/2019APART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- grease duct welds ok- all welds completed on grease duct system- seal area H1 supply duct only ok to insulate
Pressure Test4/26/20194/29/20194/29/2019APART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 60lb gas pass whole system- still need to see low pressure test when piping installed to cook line and boilers
Rough-in4/23/20194/23/20194/23/2019PPART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- Area 3G hard lids ok- Area 4 H1 and H2 fire damper framing ok- all grease duct fittings excluding drop tie ins to hood pass, need to see 4 more welds on transitions to hoods
Rough-in4/18/20194/18/20194/18/2019PPART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- grease duct light test on 45 degree in ceiling 24x18 ok, 3 joints 24x18 with 20x10 and 20x10 tap ok, and 2 joints 20x10 with 90 degree ok- will see remaining weld after hood installed and welded- ok for first layer fire wrap from roof to 2nd 45 degree offset- access doors need installed
Rough-in4/15/20194/16/20194/16/2019PPART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- area G seal on duct ok- ok to insulate- area E hard lids ok to sheetrock- walked roof
Rough-in4/11/20194/12/20194/12/2019APART
DetailsBrian Scoles
Grease duct Phone #: ###-#### Inspection requested via web by Nicholas Paige- area A and B ok for ceiling tiles flex seal and registers ok- Area F seal on duct ok- area g above hard lid only seal ok- grease duct 1 joint at 45 degree south fitting ok- condensate to vestible NW side ok
Rough-in4/4/20194/5/20194/5/2019PPART
DetailsBrian Scoles
Grease Duct Phone #: ###-#### Inspection requested via web by Nicholas Paige- grease duct from roof down to 90 degree 2 pieces straight duct with 45 degree light test ok in ceiling- 2 pieces grease with 45 degree one end tested on floor light test ok-
Rough-in4/2/20194/3/20194/3/2019APART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- area 2 c and d hard lids ok to cover- area 2 c and d firedamper angles ok- ok for grid
Rough-in4/1/20194/1/20194/1/2019PPART
DetailsBrian Scoles
fire damper inspection Phone #: ###-#### Inspection requested via web by Nicholas Paige- area E fire damper clearances ok- ok for sheetrock and angles installed- area f no fire dampers
Rough-in3/29/20193/29/20193/29/2019PPART
DetailsBrian Scoles
Dru Phone #: ###-####- area E NW corner seal on all duct ok- ok to insulate- fire damper framing fail- went over condensate drain- Dru knows about fire damper framing issues- recall in when fixed
Override - Parcel Holds3/29/20191/1/19003/29/2019  
this inspection is for mechanical- nothing to due with CSN hold
Rough-in3/19/20193/20/20193/20/2019APART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- area 2D seal on duct ok- ok for insulation- need to see framing complete in hard lid areas for exhaust drops
Rough-in3/11/20193/12/20193/12/2019APART
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- area 1B hard lids ok- ok for sheetrock
Rough-in3/5/20193/6/20193/6/2019PPASS
DetailsBrian Scoles
Phone #: ###-#### Inspection requested via web by Nicholas Paige- area 1 A hard lids ok to cover- area 1 A&B fire damper angles ok- access doors will be put in after grid is in- ok for grid area 1 A&B only
Rough-in2/25/20192/26/20192/26/2019APART
DetailsBrian Scoles
sealing and fire damper framing Phone #: ###-#### Inspection requested via web by Nicholas Paige- seal on duct area 2C only ok to insulate- fire damper framing area 2C only ok
Rough-in2/20/20192/21/20192/21/2019APART
DetailsBrian Scoles
sealing and fire damper framing Phone #: ###-#### Inspection requested via web by Nicholas Paige- area 2 C/D need some framing on 3 dampers addressed- rest are good- recall in when seal and framing completed
Conference2/8/20192/12/20192/12/2019ADONE
DetailsChad Schwendiman
Phone #: ###-#### Inspection requested via web by Nicholas Paige
Conference1/31/20191/31/20191/31/2019ADONE
DetailsChad Schwendiman
Discussed insulation requirements
Conference1/30/20191/31/20191/31/2019ADONE
DetailsBrian Scoles
please call dru 1 hr in advance so all parties can be in attendance for insulation questions. Phone #: ###-#### Inspection requested via web by Nicholas Paige- conference to discuss IECC insulation requirements- all supply, return air and outside air will need to be insulated per IECC 2015 C403.9-
Rough-in1/29/20191/30/20191/30/2019APART
DetailsBrian Scoles
Fire Damper inspection Phone #: ###-#### Inspection requested via web by Nicholas Paige- area 1 a/b 10 fire damper clearances ok- area 1 a/b seal on all duct ok- ok to insulate-all insulayion needs to be according to IECC 2015- hard lids yet to be installed-
Conference1/9/20191/9/20191/9/2019PDONE
DetailsBrian Scoles
We have some fire dampers installed and we want to make sure the inspector likes how it is done Phone #: ###-#### Inspection requested via web by Nicholas Paige- discussed fire dampers without sleeve from factory- installation instruction are a little different from approved prints- will get more info in next day or two
Issue PAID IN FULL permit  12/18/2018 DONE
Payment received via Govolutions
Application received  12/10/2018 DONE
This permit was created on the web by Nicholas Paige