BLD13-03143
| BLD-Foundation | 1/15/2014 | 1/15/2014 | 1/15/2014 4:50:05 PM | P | PASS |
|
|
keith - please call 30 minutes prior Phone #: ###-####
|
BLD13-00424
| BLD-Foundation | 1/15/2014 | 1/15/2014 | 1/15/2014 4:46:29 PM | P | PASS |
|
|
Adam Phone #: ###-####
|
BLD13-02029
| BLD-Footing | 1/14/2014 | 1/15/2014 | 1/15/2014 4:41:16 PM | P | NR |
|
|
Late afternoon - Carl Phone #: ###-####
|
BLD13-03128
| BLD-Wall Bracing | 1/15/2014 | 1/15/2014 | 1/15/2014 3:15:31 PM | P | PASS |
|
|
Troy Phone #: ###-####
|
BLD13-03436
| BLD-Final | 1/15/2014 | 1/15/2014 | 1/15/2014 1:49:56 PM | P | PASS |
|
|
2 windows & a patio door Phone #: ###-#### >> Inspection requested via web by Cheryl Hall
|
BLD13-03436
| DOC - Permit Finaled | 1/15/2014 | 1/15/2014 | 1/15/2014 1:49:25 PM | P | PASS |
|
|
|
BLD13-02810
| BLD-Framing/Rough-in | 1/15/2014 | 1/15/2014 | 1/15/2014 1:46:25 PM | P | PASS |
|
|
dave Phone #: ###-####
|
BLD13-02887
| BLD-Energy code compliance | 1/14/2014 | 1/15/2014 | 1/15/2014 12:23:34 PM | A | PASS |
|
|
Please call me if there is a problem. we have made all corrections to the framing inspection for your review. FRAME PASS> john Phone #: ###-#### >> Inspection requested via web by John Flaherty
|
GCB13-00085
| GCB-Shearwall | 1/14/2014 | 1/15/2014 | 1/15/2014 12:22:56 PM | A | PART |
|
|
Looked at inside of 1hr rated East wall. 1st layer of rock OK starting from the North end ......up to the 4th column. OK to install 2nd layer to this area. OK to install 1st layer of rock on remainder of East wall. Per detai B&C l...Page A 7.4 Shows UL 263 no.x649 Paintable firestop for columns? and also shows wrapping columns with rock.......But has been X'd out. Contractor wants to mix and match ...paint and wrap on select columns. Architect to get approval from City of Boise for using both these methods.
|
MIS13-00238
| BLD-Final | 1/14/2014 | 1/15/2014 | 1/15/2014 10:18:17 AM | A | PEND |
|
|
Called Roger.....Left V/M.
|