Inspections for the day of: Wednesday, January 15, 2014.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-03143 BLD-Foundation1/15/20141/15/20141/15/2014 4:50:05 PMPPASS
keith - please call 30 minutes prior Phone #: ###-####
BLD13-00424 BLD-Foundation1/15/20141/15/20141/15/2014 4:46:29 PMPPASS
Adam Phone #: ###-####
BLD13-02029 BLD-Footing1/14/20141/15/20141/15/2014 4:41:16 PMPNR
Late afternoon - Carl Phone #: ###-####
BLD13-03128 BLD-Wall Bracing1/15/20141/15/20141/15/2014 3:15:31 PMPPASS
Troy Phone #: ###-####
BLD13-03436 BLD-Final1/15/20141/15/20141/15/2014 1:49:56 PMPPASS
2 windows & a patio door Phone #: ###-#### >> Inspection requested via web by Cheryl Hall
BLD13-03436 DOC - Permit Finaled1/15/20141/15/20141/15/2014 1:49:25 PMPPASS
BLD13-02810 BLD-Framing/Rough-in1/15/20141/15/20141/15/2014 1:46:25 PMPPASS
dave Phone #: ###-####
BLD13-02887 BLD-Energy code compliance1/14/20141/15/20141/15/2014 12:23:34 PMAPASS
Please call me if there is a problem. we have made all corrections to the framing inspection for your review. FRAME PASS>
john
Phone #: ###-#### >> Inspection requested via web by John Flaherty
GCB13-00085 GCB-Shearwall1/14/20141/15/20141/15/2014 12:22:56 PMAPART
Looked at inside of 1hr rated East wall. 1st layer of rock OK starting from the North end ......up to the 4th column. OK to install 2nd layer to this area. OK to install 1st layer of rock on remainder of East wall. Per detai B&C l...Page A 7.4 Shows UL 263 no.x649 Paintable firestop for columns? and also shows wrapping columns with rock.......But has been X'd out. Contractor wants to mix and match ...paint and wrap on select columns. Architect to get approval from City of Boise for using both these methods.
MIS13-00238 BLD-Final1/14/20141/15/20141/15/2014 10:18:17 AMAPEND
Called Roger.....Left V/M.