PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, January 24, 2018
.
Number of inspections:
18
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Michael Zawacki
Title
EROSION INSPECTOR
Phone #
208-473-8333
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC16-01108
Tracking Control
1/18/2018
1/24/2018
1/25/2018 10:54:34 AM
A
FAIL
Talked to RP and gave him more time.
Site wasn't cleaned.
ESC15-00556
General Inspection
1/24/2018
1/24/2018
1/25/2018 10:45:00 AM
PART
DIs on corner of Ghost Bar & Boven are full and can be removed. DIs further up Ghost bar can also be removed, all homes in area completed.
Rock & sod is being stored on Taboo.
Homes on Hakkasan being built, some dirt and trash needs to be cleaned. Home work also on Tao.
Pathway behind project BMPs holding up.
ESC17-00006
Aging Inspection
1/24/2018
1/24/2018
1/24/2018 2:44:10 PM
CANC
ESC17-00006
DOC - Permit Finaled
1/24/2018
1/24/2018
1/24/2018 2:44:01 PM
P
PASS
ESC17-00391
Aging Inspection
1/24/2018
1/24/2018
1/24/2018 2:39:53 PM
CANC
ESC17-00391
DOC - Permit Finaled
1/24/2018
1/24/2018
1/24/2018 2:39:47 PM
P
PASS
ESC17-00140
General Inspection
1/24/2018
1/24/2018
1/24/2018 1:48:54 PM
PASS
WIP. House is wrapped and takes up entire lot. No way to get around, scaffolding is blocking side.
ESC16-00617
General Inspection
1/24/2018
1/24/2018
1/24/2018 1:47:55 PM
PASS
No workers on site during inspection. Foundation poured. Backfill is stored on lots next door that developer owns. Pile of trash on site that will need to be removed.
ESC16-00353
General Inspection
1/24/2018
1/24/2018
1/24/2018 1:05:55 PM
PASS
Each homesite has their own BMPs. Some trackout in area where workers are present. No runoff down road. DIs are protected and maintained.
ESC17-00190
General Inspection
1/24/2018
1/24/2018
1/24/2018 12:52:18 PM
PASS
Hillsides holding up well, no rills or erosion issues. Some trackout from lots, no WIP so probably from joyriders. Area along Bogus was muddy and people are driving through.
ESC17-00418
Aging Inspection
1/24/2018
1/24/2018
1/24/2018 12:39:19 PM
PASS
ESC17-00428
Aging Inspection
1/24/2018
1/24/2018
1/24/2018 12:06:32 PM
PASS
Building complete. Yard needs landscaping.
ESC17-00375
General Inspection
1/24/2018
1/24/2018
1/24/2018 11:24:34 AM
PART
WIP on SFH. All workers parking on paved road. Some piles of scrap lumber that will need to be cleaned. Some trackout, coming from lot posted private and being used for firewood & rough cut lumber storage. No dirt leaving area and DI on ethridge clean and protected.
ESC17-01172
Random Inspection
1/24/2018
1/24/2018
1/24/2018 11:06:59 AM
P
PASS
Lots of trackout. Sweepers are scheduled for the end of work days. Contractor working with ACHD to keep fairview clean.
ESC16-01028
Tracking Control
1/18/2018
1/24/2018
1/24/2018 10:30:23 AM
A
PART
Site is still messy. Laborer brought in full time to clean site. Asked them to focus on aprons and cross walks, area where dirt can easily get off sidewalk and into road. Will continue to monitor. Syman is still doing inspections and maintaining DIs.
ESC17-00330
Aging Inspection
1/24/2018
1/24/2018
1/24/2018 9:46:47 AM
PASS
WIP. House is on foundation. Some of the yard is exposed dirt, lower than sidewalk level and not leaving site. Other part of yard is rock and sand. Permit on post but everything has faded off.
ESC17-00971
Tracking Control
1/23/2018
1/24/2018
1/24/2018 9:35:38 AM
P
PEND
Spoke to Zach on site. Told him we are getting complaints about trackout. Said he would sweep road at end of day and keep it clean. Workers are using Linda Vista only, some vehicles have gone out onto Mitchell. He will get both clean and I suggested barricades to prevent joy riders.
ESC16-01278
Tracking Control
1/12/2018
1/24/2018
1/23/2018 4:00:54 PM
A
FAIL