Inspections for the day of: Thursday, January 9, 2020.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-03112 BLD-Aging Inspection1/9/20201/9/20201/13/2020 9:08:25 AM DONE
Expires: 02/23/20
BLD19-01461 BLD-Aging Inspection1/9/20201/9/20201/13/2020 9:03:48 AM DONE
Expires: 02/24/20
MIS19-00039 MIS-Aging Inspection1/9/20201/9/20201/13/2020 9:02:36 AM DONE
BLD19-03644 BLD-Final1/9/20201/9/20201/9/2020 3:56:09 PMPNR
Shane Phone #: ###-####//need mechanical permits finaled prior to final building inspection//talked with Shane, and asked he reschedule when complete//
BLD19-02364 BLD-Framing/Rough-in1/8/20201/9/20201/9/2020 3:52:38 PMPNR
Kirk Phone #: ###-####//used inspection request as conference//discussed structural issues and will be meeting again//need mechanical, plumbing and electrical isnpected prior to framing//
BLD19-04687 BLD-Framing/Rough-in1/8/20201/9/20201/9/2020 3:29:52 PMPPASS
Rex Phone #: ###-####//ok per plans//discussed smoke Co detectors//ok to insulate//
BLD19-02579 BLD-Energy code compliance1/9/20201/9/20201/9/2020 2:42:49 PMPFAIL
chris Phone #: ###-####//plans show R-50 attic insulation on details,, code minimum is R-49,, R 38 batts were installed in some locations//add insulation to meet plans//need mechanical pass on gas fireplace prior to cover//
BLD19-04272 BLD-Foundation1/9/20201/9/20201/9/2020 2:09:10 PMPPART
CHET Phone #: ###-####//WIP//ok to pour walls when lentels are added per details--#6 bar in openings over 8 feet//cold weather practices discussed onsite//blankets onsite//
BLD19-04484 BLD-Final1/8/20201/9/20201/9/2020 12:32:43 PMAPASS
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher//sign appears to be installed within the requirements of the scope of work//
BLD19-04484 DOC - Permit Finaled1/9/20201/9/20201/9/2020 12:32:02 PMPPASS
BLD19-04775 BLD-Framing/Rough-in1/8/20201/9/20201/9/2020 12:21:15 PMACANC
Jay Walters is the best point of contact. Phone #: ###-#### Inspection requested via web by BRS Permitting//no framing inspection is required as no work to the existing structure needs completed per the engineering//
BLD19-00527 BLD-Framing/Rough-in1/8/20201/9/20201/9/2020 12:06:48 PMANR
Framing inspection at prerock areas behind tubs on 1st and 2nd floors and for cover at top of stairways and exterior balconies Phone #: ###-#### Inspection requested via web by Travis Blackburn//inspection request was used as a conference to discuss ceiling, wall rating for 2 HR corridor areas and fireblocking at pre-rock areas for tubs and showers//
BLD19-00646 BLD-Footing1/8/20201/9/20201/9/2020 10:37:26 AMAPASS
Steve Phone #: ###-####//rebar and setbacks verified on previous inspection//cold weather techniques discussed and will be used//
BLD19-01694 BLD-Final1/8/20201/9/20201/9/2020 10:12:36 AMAPASS
Willy Phone #: ###-####//corrections made//final complete//
BLD19-01694 DOC - Permit Finaled1/9/20201/9/20201/9/2020 10:12:02 AMPPASS
BLD19-01694 BLD-Blower Door Test Results1/9/20201/9/20201/9/2020 10:11:52 AMADONE
4.15 ACH 50
BLD19-04539 BLD-Final1/8/20201/9/20201/9/2020 9:56:49 AMAPASS
after 930 // Bruce Phone #: ###-####
BLD19-04539 DOC - Permit Finaled1/9/20201/9/20201/9/2020 9:56:41 AMPPASS
BLD19-03475 BLD-Conference1/9/20201/9/20201/9/2020 9:56:32 AMADONE
Per Matt, check floor for structural at access in master bathroom, cut access indicates floor is sagging//
BLD19-04412 BLD-Framing/Rough-in1/8/20201/9/20201/9/2020 9:20:40 AMANR
lawrence Phone #: ###-####//not ready//used as conference//