BLD18-03112
| BLD-Aging Inspection | 1/9/2020 | 1/9/2020 | 1/13/2020 9:08:25 AM | | DONE |
|
|
Expires: 02/23/20
|
BLD19-01461
| BLD-Aging Inspection | 1/9/2020 | 1/9/2020 | 1/13/2020 9:03:48 AM | | DONE |
|
|
Expires: 02/24/20
|
MIS19-00039
| MIS-Aging Inspection | 1/9/2020 | 1/9/2020 | 1/13/2020 9:02:36 AM | | DONE |
|
|
|
BLD19-03644
| BLD-Final | 1/9/2020 | 1/9/2020 | 1/9/2020 3:56:09 PM | P | NR |
|
|
Shane Phone #: ###-####//need mechanical permits finaled prior to final building inspection//talked with Shane, and asked he reschedule when complete//
|
BLD19-02364
| BLD-Framing/Rough-in | 1/8/2020 | 1/9/2020 | 1/9/2020 3:52:38 PM | P | NR |
|
|
Kirk Phone #: ###-####//used inspection request as conference//discussed structural issues and will be meeting again//need mechanical, plumbing and electrical isnpected prior to framing//
|
BLD19-04687
| BLD-Framing/Rough-in | 1/8/2020 | 1/9/2020 | 1/9/2020 3:29:52 PM | P | PASS |
|
|
Rex Phone #: ###-####//ok per plans//discussed smoke Co detectors//ok to insulate//
|
BLD19-02579
| BLD-Energy code compliance | 1/9/2020 | 1/9/2020 | 1/9/2020 2:42:49 PM | P | FAIL |
|
|
chris Phone #: ###-####//plans show R-50 attic insulation on details,, code minimum is R-49,, R 38 batts were installed in some locations//add insulation to meet plans//need mechanical pass on gas fireplace prior to cover//
|
BLD19-04272
| BLD-Foundation | 1/9/2020 | 1/9/2020 | 1/9/2020 2:09:10 PM | P | PART |
|
|
CHET Phone #: ###-####//WIP//ok to pour walls when lentels are added per details--#6 bar in openings over 8 feet//cold weather practices discussed onsite//blankets onsite//
|
BLD19-04484
| BLD-Final | 1/8/2020 | 1/9/2020 | 1/9/2020 12:32:43 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher//sign appears to be installed within the requirements of the scope of work//
|
BLD19-04484
| DOC - Permit Finaled | 1/9/2020 | 1/9/2020 | 1/9/2020 12:32:02 PM | P | PASS |
|
|
|
BLD19-04775
| BLD-Framing/Rough-in | 1/8/2020 | 1/9/2020 | 1/9/2020 12:21:15 PM | A | CANC |
|
|
Jay Walters is the best point of contact. Phone #: ###-#### Inspection requested via web by BRS Permitting//no framing inspection is required as no work to the existing structure needs completed per the engineering//
|
BLD19-00527
| BLD-Framing/Rough-in | 1/8/2020 | 1/9/2020 | 1/9/2020 12:06:48 PM | A | NR |
|
|
Framing inspection at prerock areas behind tubs on 1st and 2nd floors and for cover at top of stairways and exterior balconies Phone #: ###-#### Inspection requested via web by Travis Blackburn//inspection request was used as a conference to discuss ceiling, wall rating for 2 HR corridor areas and fireblocking at pre-rock areas for tubs and showers//
|
BLD19-00646
| BLD-Footing | 1/8/2020 | 1/9/2020 | 1/9/2020 10:37:26 AM | A | PASS |
|
|
Steve Phone #: ###-####//rebar and setbacks verified on previous inspection//cold weather techniques discussed and will be used//
|
BLD19-01694
| BLD-Final | 1/8/2020 | 1/9/2020 | 1/9/2020 10:12:36 AM | A | PASS |
|
|
Willy Phone #: ###-####//corrections made//final complete//
|
BLD19-01694
| DOC - Permit Finaled | 1/9/2020 | 1/9/2020 | 1/9/2020 10:12:02 AM | P | PASS |
|
|
|
BLD19-01694
| BLD-Blower Door Test Results | 1/9/2020 | 1/9/2020 | 1/9/2020 10:11:52 AM | A | DONE |
|
|
4.15 ACH 50
|
BLD19-04539
| BLD-Final | 1/8/2020 | 1/9/2020 | 1/9/2020 9:56:49 AM | A | PASS |
|
|
after 930 // Bruce Phone #: ###-####
|
BLD19-04539
| DOC - Permit Finaled | 1/9/2020 | 1/9/2020 | 1/9/2020 9:56:41 AM | P | PASS |
|
|
|
BLD19-03475
| BLD-Conference | 1/9/2020 | 1/9/2020 | 1/9/2020 9:56:32 AM | A | DONE |
|
|
Per Matt, check floor for structural at access in master bathroom, cut access indicates floor is sagging//
|
BLD19-04412
| BLD-Framing/Rough-in | 1/8/2020 | 1/9/2020 | 1/9/2020 9:20:40 AM | A | NR |
|
|
lawrence Phone #: ###-####//not ready//used as conference//
|