ELE18-03436
| Final | 10/12/2018 | 10/15/2018 | 10/15/2018 3:43:39 PM | P | PASS |
|
|
Kim. Phone #: ###-#### Inspection requested via web by Sean DeLacy...ok to final
|
ELE18-03782
| Final | 10/15/2018 | 10/15/2018 | 10/15/2018 3:00:51 PM | P | PASS |
|
|
Call Foreman 30-60 min ahead: Bryce Waterman Phone #: ###-#### Inspection requested via web by Rob Maes... OCPD, disconnect, and labelling complete
|
ELE18-03782
| Electrical Rough-In | 10/12/2018 | 10/15/2018 | 10/15/2018 3:00:17 PM | P | PASS |
|
|
Call Foreman 30-60 min ahead: Bryce Waterman Phone #: ###-#### Inspection requested via web by Rob Maes... UL listed equipment line side tap
|
ELE18-02364
| Final | 10/14/2018 | 10/15/2018 | 10/15/2018 2:48:15 PM | P | PASS |
|
|
Please call 30 minutes prior. Thanks. Phone #: ###-#### Inspection requested via web by Robert Pietras...ok to final
|
ELE18-03926
| Final | 10/12/2018 | 10/15/2018 | 10/15/2018 2:28:15 PM | P | NR |
|
|
Please call 30 minutes prior as no-one is on site Phone #: ###-#### Inspection requested via web by Kerri Hamilton....needed rough inspection...schedule final once cover on pole light installed and bonded
|
ELE18-03926
| Electrical Rough-In | 10/15/2018 | 10/15/2018 | 10/15/2018 2:26:45 PM | P | PASS |
|
|
Please call 30 minutes prior as no-one is on site Phone #: ###-#### Inspection requested via web by Kerri Hamilton...extension of parking lot light...moved base and extended pipe add wire
|
ELE18-02294
| Electrical Rough-In | 10/15/2018 | 10/15/2018 | 10/15/2018 1:54:08 PM | P | PASS |
|
|
Patrick Phone #: ###-####...ok to cover walls and ceiling ...verify at final washer outlet dedicate and upstairs outlet right of door and light left of door extended to sheetrock properly
|
ELE18-03937
| Electrical Rough-In | 10/14/2018 | 10/15/2018 | 10/15/2018 1:12:14 PM | P | PASS |
|
|
rough in walls second floor.enter the door next to the dumpster on south east end of the building. Phone #: ###-#### Inspection requested via web by Mark Morgan...upstairs wall where moved electrical for doorway...ok to cover
|
ELE18-03496
| Final | 10/12/2018 | 10/15/2018 | 10/15/2018 12:01:55 PM | A | PASS |
|
|
Contact Kris Nash for any questions Phone #: ###-#### Inspection requested via web by Christy Cheney...ok to final
|
ELE18-01833
| Electrical Rough-In | 10/12/2018 | 10/15/2018 | 10/15/2018 9:57:30 AM | A | PASS |
|
|
Atm canopy Phone #: ###-#### Inspection requested via web by Tom Jenkins...ok to cover..can lights and power for signage
|
ELE18-03783
| Final | 10/9/2018 | 10/15/2018 | 10/15/2018 9:49:43 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rob Maes...OCPD, disconnect, and labelling ok
|
ELE18-00849
| Electrical Rough-In | 10/12/2018 | 10/15/2018 | 10/15/2018 9:20:50 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...ceiling grid 2 small areas for sprinklers...ok to cover
|
ELE18-02490
| Final | 10/12/2018 | 10/15/2018 | 10/15/2018 8:48:36 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...ok to final
|
ELE18-03025
| Permanent Service | 10/15/2018 | 10/15/2018 | 10/15/2018 8:19:37 AM | A | PASS |
|
|
Service inspections for Idaho Power to install meter. please call 30 minutes before inspection so i can make sure building is unlocked. Phone #: ###-#### Inspection requested via web by Jim Noll... previously inspected 9/12/18 by Mark Moncarr p/s u/g new ok
|
ELE18-03782
| Electrical Rough-In | 10/12/2018 | 10/15/2018 | 10/12/2018 1:04:44 PM | A | CANC |
|
|
Call 30 - 60 min ahead - Foreman: Brad Hallman Phone #: ###-#### >> Inspection requested via web by Rob Maes Inspection cancelled from web by: Rob Maes
|