Inspections for the day of: Tuesday, October 15, 2019.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00861 Site Preparation10/15/201910/15/201910/16/2019 12:39:23 PMPPASS
ork has begun on creek channel. Entrance is on south of old Fred Meyer distro.
Gravel entrance, work is a few hundred yards back. Lots of vegetation on site. Will not need to haul away striped material. Water truck on site, needs to cross Gowen to fill.
ESC18-00979 General Inspection10/15/201910/15/201910/16/2019 11:37:22 AMPPASS
Work completed. Will monitor until spring for stbalization.
ESC19-00608 Site Preparation10/15/201910/15/201910/16/2019 11:33:43 AMPDONE
Grading has begun, work on airport grounds behind gate and fence.
ESC19-00630 General Inspection10/14/201910/15/201910/16/2019 11:28:28 AMPPASS
Area has been graded, some stockpiles in center of site. Area surrounded by dessert. Some removed concrete stored in middle by loading docks, no addition to the distribution building has been done.
Site is accessed from south along gravel road, site has basalt entrance.
ESC18-01460 General Inspection10/15/201910/15/201910/16/2019 10:40:06 AMPPASS
Visual inspection, site on airport. Everything looks contained, nothing blowing towards orchard.
ESC18-01761 General Inspection10/15/201910/15/201910/16/2019 10:38:41 AMPPASS
Builkding is up, area aroung it is all pit run. Everything contained in Knife River yard.
ESC18-00899 General Inspection10/15/201910/15/201910/15/2019 12:29:37 PMPFAIL
Lots of windblown trash alonge south east rear of site.
Concrete washout is full.
Waste has been dumped around concrete washout.
Dirt on roads and sidewalks.
Sent message to everyone I have number with a Tresido Homes.
ESC17-01088 General Inspection10/15/201910/15/201910/15/2019 11:53:45 AM PASS
WIp on a few homes in back. No trackout or blowing dust. No issues at time of inspection. ite still has some vacant lots.
ESC19-00658 General Inspection10/15/201910/15/201910/15/2019 11:21:33 AMPPASS
Crew on site boring under road. No new construction activity on site.
ESC18-00659 General Inspection10/15/201910/15/201910/15/2019 11:14:01 AM PASS
WIP on installing car ports.
Job trailer is now on southern lot. Saw cut asphalt from car ports is stored on southern lot, large debris pile still on lot.
ESC18-00162 Site Preparation10/14/201910/15/201910/15/2019 10:57:39 AMAPASS
Met with shop owner. Perimeter controls in place, entrance and washout installed. Site is good to go.
ESC18-01774 Site Final10/15/201910/15/201910/15/2019 9:35:31 AMPPASS
ESC17-00471 Site Final10/15/201910/15/201910/15/2019 9:34:18 AMPNR
Area being developed. Still exposed, project not completed.
ESC19-00601 General Inspection10/14/201910/15/201910/14/2019 2:31:33 PMAPASS
Home is framed and roofed, no gutters. Perimeter protected by wattle and silt fence. Some trash around site, none has blown away.
ESC19-01345 Site Preparation10/11/201910/15/201910/14/2019 2:21:20 PMAPASS
WIP on wall.
Wattle and natural buffer on hillside below. Wattle protecting neighbors prperty line. Site is below road.
ESC17-00925 Site Final10/14/201910/15/201910/14/2019 10:56:25 AMPPASS
ESC18-01227 General Inspection10/11/201910/15/201910/14/2019 9:48:53 AMPPASS
2 units under construction. Foundations for additional units excavated but not yet poured. Tubs washouts on site. All material stored on parking lot. No loose trash.