ESC18-01446
| Aging Inspection | 10/2/2019 | 10/2/2019 | 10/4/2019 11:11:01 AM | | PASS |
|
|
House is framed and roofed, lot contained. Curbing has forms installed, not poured, pool washout on site.
|
ESC17-00640
| General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 2:02:18 PM | | PASS |
|
|
|
ESC18-00141
| General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 2:02:01 PM | | PASS |
|
|
All trash in box, none has blown out. Lot looks prepped for landscaping.
|
ESC19-00542
| General Inspection | 10/1/2019 | 10/2/2019 | 10/2/2019 12:34:32 PM | A | PASS |
|
|
Job being postponed. Part to tap into pipe needed to be overnighted. Scheduled follow up tommorow.
|
ESC19-00927
| General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 11:58:19 AM | P | PASS |
|
|
No new activity at site.
|
ESC16-00406
| General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 11:52:58 AM | | PASS |
|
|
WIP on multiple homes on phase. No esc issues in area. SIte RP is usually available on site.
|
ESC18-00498
| General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 11:51:22 AM | P | PASS |
|
|
No work on any homes in phase. Job trailer has been moved over onto lots. Landscape crew on site doing work at entrance and spur road on site. No issues at site.
|
ESC18-00311
| General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 11:41:20 AM | | PASS |
|
|
Lot has been landscaped. EcB INSTALLED ALONG SIDE PERIMETER AND ON HILLSIDE BELOW HOME.
|
ESC19-00241
| General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 11:27:24 AM | P | PASS |
|
|
Met with foreman at site. Just completed a pour, washouts were used. Masons have secondary containment for mortar mixers and a washout. No loose trash at site. Pit run will be brought in to make ring road around site. Entrances will be elongated and entrance will get rock to also serve as exit.
|
ESC17-00190
| General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 11:02:36 AM | | PASS |
|
|
No new activity. Talked to project owner, few more lots sold and should see some building soon.
|
ESC19-00994
| General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 11:01:40 AM | P | PASS |
|
|
Met with site owner on site. Has syman scheduled to do hydroseeding as soon as grading is completed, will see about staging and starting work in areas where it is ready instaed of waiting for all grading to be completed. Is going to double check riprap at outlet. Granite is now hauling material from east to west side of bogus. Some dirt trails across road, get swept as day goes on.
|
ESC17-01287
| General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 10:20:52 AM | | PASS |
|
|
Will continue to monitor until stable
|
ESC18-01447
| General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 10:08:42 AM | P | FAIL |
|
|
Concret work in progress. No washout container on site, washout dumped behing backfill.
|
ESC18-01022
| General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 9:58:20 AM | P | PASS |
|
|
WIP on joint trench. Talked to RP and she thinks they should be able to pave this fall. Work on section of road leading to phase 8 where the bollards use to be. Widening and adding sidewalks per ACHD, also some repair at bottom.
|