ESC15-00541
| General Inspection | 11/15/2016 | 11/15/2016 | 11/17/2016 4:45:33 PM | | PASS |
|
|
|
ESC16-00948
| General Inspection | 11/15/2016 | 11/15/2016 | 11/16/2016 2:55:28 PM | P | CANC |
|
|
rescheduled
|
ESC16-00706
| General Inspection | 11/15/2016 | 11/15/2016 | 11/16/2016 11:19:57 AM | A | PART |
|
|
No site preparation inspection requested. No inlet protection installed.
Permit sign posted, no trackout or discharges. Clear to waive DI protection due to overflow potential from large drainage area from both directions of Hill Road.
Notified RP that Site Prep inspections are required for new SFHs regardless of location.
|
ESC15-01420
| Conference | 11/15/2016 | 11/15/2016 | 11/16/2016 10:17:51 AM | P | PEND |
|
|
follow up
Notified RP of issue with drainage pipe and erosion fill pipe with mud....awaiting schedule. Notified concerned party that the issue is in process of being resolved.
|
ESC16-01546
| Site Preparation | 11/14/2016 | 11/15/2016 | 11/15/2016 3:28:24 PM | P | PASS |
|
|
Permit sign posted. Housekeeping main BMP. Approved for construction
|
ESC16-00372
| Aging Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 3:20:09 PM | | PASS |
|
|
|
ESC16-00372
| DOC - Permit Finaled | 11/15/2016 | 11/15/2016 | 11/15/2016 3:20:01 PM | P | PASS |
|
|
|
ESC16-00592
| DOC - Permit Finaled | 11/15/2016 | 11/15/2016 | 11/15/2016 3:19:07 PM | P | PASS |
|
|
|
ESC13-00193
| General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 3:11:46 PM | | PEND |
|
|
No issues on culdesac lots. Temporary access to backyards of Painter Rock homes still needs erosion and sediment controls installed. Home below access is not yet complete and backyard not yet landscaped...
|
ESC15-01256
| General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 3:07:51 PM | | PASS |
|
|
Home complete, landscaped and occupied. BLD finaled. No ESC corrections needed, temporary BMPs in Somerset Village to remain while active construction on other lots is ongoing.
|
ESC15-01256
| DOC - Permit Finaled | 11/15/2016 | 11/15/2016 | 11/15/2016 3:06:56 PM | P | PASS |
|
|
|
ESC16-00614
| DOC - Permit Finaled | 11/15/2016 | 11/15/2016 | 11/15/2016 3:02:48 PM | P | PASS |
|
|
|
ESC15-00862
| General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 2:57:51 PM | | PEND |
|
|
revegetation...no changes since prior inspeciton
|
ESC16-00936
| Site Preparation | 11/14/2016 | 11/15/2016 | 11/15/2016 2:50:56 PM | P | PASS |
|
|
2:00 PM Cleve Cushing ###-####
Approved for construction. Perimeter silt fence installed properly at bottom of lot. Permit sign and ESC plan on site. First phase will be to demolish/remove old concrete slab tennis court, then provide stabilized entrance.
Note: no DI protection to be installed to prevent clogs or unintentional re-routing of stormwater.
|
ESC15-01210
| General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 2:48:30 PM | | PASS |
|
|
No activity. Erosion controls working well, no rills observed, no sediment leaving site. No corrections. NO SFH activity yet
|
ESC16-00935
| Site Preparation | 11/14/2016 | 11/15/2016 | 11/15/2016 2:47:09 PM | P | PASS |
|
|
2:00 PM Cleve Cushing ###-####
First phase of construction is to install permanent heavy duty fencing and stormwater swale at bottom of lot for drainage. Perimeter silt fence has been installed properly per ESC plan.
No DI protection to be installed due to slope of road and catchment area for storm drain. Do not want to overwhelm or clog inlets which could send stormwater over the hillside or onto existing property. RP Cleve to increase gutter and street sweeping frequency.
Approved for construction.
|
ESC16-00625
| General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 1:48:46 PM | P | PASS |
|
|
No activity, site currently on hold due to natural seep/spring. Plans being developed to manage the water. Silt fence installed at bottom of lot, permit sign posted.
|
ESC15-01138
| General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 1:46:03 PM | P | PASS |
|
|
WIP on framing and roof. Retaining walls have been installed. No erosion or sediment leaving bottom of site. No vehicle trackout or discharges to street. NO corrections at this time.
|
ESC15-00556
| General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 11:39:46 AM | | PASS |
|
|
No new subdivsion devlopment activity. Lots in new phase have had drainage control earthen berms installed with intention to retain runoff on site. All inlets have sediment protection installed. Tahoe Homes utilizing lined concrete washout pit.
No corrections requested.
|
ESC16-00120
| Aging Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 11:35:35 AM | | PASS |
|
|
|
ESC16-00267
| Aging Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 11:34:10 AM | | PASS |
|
|
Home complete, landscaped and construction materials and equipment removed. BLD finaled. No final ESC requests, permit conditions satisfied.
|
ESC16-00267
| DOC - Permit Finaled | 11/15/2016 | 11/15/2016 | 11/15/2016 11:33:23 AM | P | PASS |
|
|
|
ESC14-00657
| Site Final | 11/15/2016 | 11/15/2016 | 11/15/2016 11:28:43 AM | P | NR |
|
|
Corrections needed before ESC final:
1. Remove DI bags on Signal Rock at both intersections with Playwright 2. Sweep up concrete dust and loose sediment where the concrete wasshout pan was placed
3. Pick up wind blown construction and employee waste on south side of Warm Springs.
Note: all DI bags except the two on Playwright on both sides of the active SFHs by Alturas should remain.
|
ESC16-00810
| Site Preparation | 11/14/2016 | 11/15/2016 | 11/15/2016 10:41:33 AM | A | PASS |
|
|
Clint Phone #: ###-####
Project already active and near completion. Contractor intended for Public Works drainage inspection.
Provided PW Inspection # ###-####
No ESC issues. Approved.
|
ESC15-01224
| General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 10:14:30 AM | | PASS |
|
|
WIP on Bown Library! branch. Site parking areas and pavers are installed. Impervious surfaces free of loose dirt/trackout. Liquid waste washout pans onsite. No ESC corrections neeeded
|
ESC15-01004
| General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 10:02:16 AM | A | PASS |
|
|
Vertical construction in progress. Concrete washout/liquid waste containment pans utilized. Myrtle Street staging lane has been cleaned. No discharges. Permit sign /SWPPP info posted on Broad Street.
|
ESC15-01004
| Site Final | 11/15/2016 | 11/15/2016 | 11/15/2016 9:59:11 AM | P | CANC |
|
|
data entry error. WIP
|
ESC15-01193
| Site Final | 11/15/2016 | 11/15/2016 | 11/15/2016 9:51:11 AM | A | PASS |
|
|
Construction activity complete. Yard has been landscaped and hydroseeded. Home occupied. All permits finaled.
|
ESC15-01050
| Site Preparation | 11/14/2016 | 11/15/2016 | 11/15/2016 9:41:48 AM | A | PEND |
|
|
Tommy// please call before Phone #: ###-####
John ###-####
Need to check for approved plans for parking lot area at 11020 Joplin...
|
ESC07-00101
| DOC - Permit Finaled | 11/15/2016 | 11/15/2016 | 11/15/2016 8:54:26 AM | P | PASS |
|
|
old expired permit, no inspection
|
ESC03-00819
| DOC - Permit Finaled | 11/15/2016 | 11/15/2016 | 11/15/2016 8:54:07 AM | P | PASS |
|
|
old expired permit, no inspection
|
ESC04-01518
| DOC - Permit Finaled | 11/15/2016 | 11/15/2016 | 11/15/2016 7:36:08 AM | P | PASS |
|
|
old expired permit, no inspection
|
ESC16-00364
| Aging Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 7:32:32 AM | | DEFR |
|
|
to be finaled by BLD inspector
|
ESC16-00233
| General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 7:29:17 AM | | CANC |
|
|
|
ESC15-00957
| General Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 7:28:56 AM | | CANC |
|
|
|
ESC16-00368
| Aging Inspection | 11/15/2016 | 11/15/2016 | 11/15/2016 7:23:17 AM | | CANC |
|
|
|
ESC15-00504
| General Inspection | 11/10/2016 | 11/15/2016 | 11/14/2016 11:09:10 AM | A | PART |
|
|
Vertical construction in progress on apartment buildings on the east and west ends of Kensington. No trackout outside of site to Saxton, State or Gary. Silt fence perimeter BMP installed on northern property limts. Onsite drop inlets have sediment protection. Trash containment provided throughout site. No major windblown trash issues observed.
Correction request: - sweep up lanes surrounding the unprotected permeable pavers to prevent clogging/failure. Prohibit / conduct training to works to park in designated areas and to not store stockpiles on impervious parking surfaces that drain to the pavers.
Notified Barry with Bach.
|