Inspections for the day of: Thursday, November 16, 2017.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS17-00387 ESC-Conference11/16/201711/16/201711/21/2017 10:17:37 AMPDONE
Stockpiling by SC Construction @ 3454 - 3476 Anderson. Investigation pending to get proper permits and BMPs in place. See MIS17-00396
ESC16-01475 Aging Inspection11/16/201711/16/201711/17/2017 4:02:24 PM CANC
ESC17-00023 Aging Inspection11/16/201711/16/201711/17/2017 3:25:05 PM CANC
ESC16-01652 Aging Inspection11/16/201711/16/201711/17/2017 3:24:31 PM CANC
ESC17-00235 General Inspection11/16/201711/16/201711/17/2017 3:24:08 PM CANC
ESC16-00225 General Inspection11/16/201711/16/201711/17/2017 8:10:38 AM CANC
ESC15-00306 Site Preparation11/15/201711/16/201711/16/2017 1:59:05 PMAPASS
9:30 walk through of BMPs for river bank repairs.

Site inspection and SWPPP binder review completed with McMillen project team, RP on permit Olivia W. coordinated conference/inspection.

Superintendant on site is Ralph Behrens. Multiple river bank repair sites between ESP and Veteran's Mem. Parkway (VMP).

BMPs include:
-Heavy duty rock construction entrances installed at both access points (Esther Simplot Park (ESP) and Stilson off VMP)
- Sediment control wattles and silt fence installed properly at low points and sensitive boundaries of each repair zone.
- Site to be inspected daily by onsite crew and also frequently by office staff.
- Stockpile areas and construction access routes have been designated to prevent excess disturbance or increase potential risk of sediment runoff from stockpiles during rain events.
- Permit signage posted at each end of project. SWPPP info located at entrance in ESP.

- significant earthwork to begin next week. Follow up inspection scheduled.

Approved for construction, BMPs approved.
ESC17-00076 Aging Inspection11/16/201711/16/201711/16/2017 1:49:40 PM PASS
ESC16-00406 General Inspection11/16/201711/16/201711/16/2017 1:49:06 PMPPASS
Erosion and sediment controls installed are working well. No new erosion rills or evidence of sediment runoff from slopes and graded parcels. 1 SFH in progress. No violations observed. RP Clayton on-site.

Two corrections needed before next inspection:
- new concrete washout facility (existing is full)
- repair wattle next to CC Golf Course golf cart path. Watch out for any increase in rills on this slope.
ESC17-01457 Site Preparation11/16/201711/16/201711/16/2017 11:58:39 AMAPASS
WIP, previously approved for construction. Foundations poured, concrete washout utilized. ESC permit signs posted around perimeter of Idaho Street townhomes project. No trackout or discharges
ESC17-01464 Site Preparation11/16/201711/16/201711/16/2017 11:58:26 AMAPASS
WIP, previously approved for construction. Foundations poured, concrete washout utilized. ESC permit signs posted around perimeter of Idaho Street townhomes project. No trackout or discharges
ESC17-01132 Random Inspection11/16/201711/16/201711/16/2017 11:57:32 AMPPASS
First phase permit ESC17-00992 has been finaled. All remaining covered under this permit.

Perimeter controls, inlet protection and construction entrance is installed.

Beniton RP Chase Coooper ###-####
ESC17-00992 Random Inspection11/16/201711/16/201711/16/2017 11:54:09 AMPPASS
First phase of project covered under this permit is complete. New grading and building permits have been issued, ESC covered under ESC17-01132. Beniton is operator and same RP Chase is on duty.
ESC17-00992 DOC - Permit Finaled11/16/201711/16/201711/16/2017 11:52:45 AMPPASS
ESC15-00976 General Inspection11/16/201711/16/201711/16/2017 11:50:56 AM PASS
Idaho Street townhome project is back in progress. 6 townhomes on east side of block now have active permits. Foundations have been poured, concrete wahout pit has been utilized. Permit signs posted around perimeter. No trackout or discharges.
ESC17-00221 General Inspection11/16/201711/16/201711/16/2017 8:21:45 AM PASS
ESC17-00221 DOC - Permit Finaled11/16/201711/16/201711/16/2017 8:21:36 AMPPASS
ESC16-01414 DOC - Permit Finaled11/16/201711/16/201711/16/2017 8:07:29 AMPPASS
ESC17-00032 DOC - Permit Finaled11/16/201711/16/201711/16/2017 7:53:03 AMPPASS