ESC19-00571
| General Inspection | 11/19/2019 | 11/19/2019 | 11/22/2019 10:58:20 AM | P | PASS |
|
|
Concrete contractor with trailer of forms at sdite. No ESC issues.
|
ESC17-00302
| General Inspection | 11/19/2019 | 11/19/2019 | 11/22/2019 10:57:33 AM | P | CANC |
|
|
|
ESC18-01651
| Site Final | 10/31/2019 | 11/19/2019 | 11/20/2019 9:41:53 AM | P | PASS |
|
|
|
ESC19-00780
| General Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 1:20:32 PM | P | PASS |
|
|
Started filling in backfill. All m,aterial between road and sidewalks has been removed. Backfill still on lot, gator guard protecting sidewalks.
|
ESC19-01120
| General Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 1:19:40 PM | P | PASS |
|
|
Crew setting forms and rebar for foundation and stem walls. No issues.
|
ESC16-00935
| General Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 1:19:08 PM | | PASS |
|
|
No new activity
|
ESC18-00920
| General Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 1:18:49 PM | | PASS |
|
|
No new activity.
|
ESC18-00818
| General Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 12:04:36 PM | | PASS |
|
|
No new activity
|
ESC18-00172
| Aging Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 11:44:05 AM | | PASS |
|
|
No new activity. Still no landscaping or driveway.
|
ESC18-00176
| Aging Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 11:35:41 AM | | PASS |
|
|
Site is clean. Being prepped for paving, scheduled for 11/20
|
ESC19-00880
| General Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 11:21:12 AM | P | PASS |
|
|
NO NEW ACTIVITY AT SITE. nOTHING LEAVING AREA.
|
ESC19-00698
| General Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 11:12:13 AM | P | PASS |
|
|
Site is prepped for landscaping. ZParking lot and curbing completed. Building is wrapped, outside is clean.
|
ESC19-00141
| General Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 11:01:15 AM | P | PASS |
|
|
Framers just starting back wall. Will need to watch for blowing trash. No new concrete work, foreman not on site.
|
ESC18-01289
| General Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 10:47:32 AM | P | PASS |
|
|
Around site is now paved, no one should need to drive in dirt. Material for next phase of buildings delivered, pads have been poured. May start pads for next phase depending on weather. Trash has been cleaned from neighboring lot.
|
ESC18-00983
| General Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 10:17:03 AM | | PASS |
|
|
Work on lower section. Area is clean. No work has started on upper section.
|
ESC19-00623
| General Inspection | 11/12/2019 | 11/19/2019 | 11/19/2019 9:57:16 AM | P | FAIL |
|
|
Washout not repaired, message sent to RP.
|
ESC18-00068
| Aging Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 9:11:57 AM | | PASS |
|
|
Home not moved
|
ESC18-00076
| Aging Inspection | 11/19/2019 | 11/19/2019 | 11/19/2019 9:11:38 AM | | PASS |
|
|
Home not moved.
|
ESC18-00426
| BMP Violation | 11/14/2019 | 11/19/2019 | 11/18/2019 8:15:30 AM | A | DONE |
|
|
Talked with RP. Has washout on site, will clean old dumped when excavator at site to do next foundations this week. Will do a trash walk also.
|