ESC17-00809
| Aging Inspection | 12/10/2018 | 12/10/2018 | 12/11/2018 12:15:03 PM | | PASS |
|
|
Site contained, no ESC issues.
|
ESC18-01070
| General Inspection | 12/10/2018 | 12/10/2018 | 12/11/2018 11:45:44 AM | P | PASS |
|
|
Did not see any dumped or spilled washout.
|
ESC18-00282
| Site Final | 12/10/2018 | 12/10/2018 | 12/10/2018 2:32:16 PM | A | PASS |
|
|
Inspection requested via web by Ken Litzinger
|
ESC13-00193
| General Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 2:18:50 PM | | PASS |
|
|
Two homes under construction nearly complete. 3 vacant lots remain.
|
ESC18-00071
| General Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 12:55:24 PM | | PASS |
|
|
Vacant lot for next building is sitting idle. All workers onsite are doing interior work.
|
ESC18-01022
| General Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 12:35:12 PM | P | PASS |
|
|
Site is all snow covered. Sledders have gone down hill and ran over wattles. Talked to RP and they will try to figure a way to keep people off.
|
ESC18-00737
| General Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 12:26:02 PM | P | FAIL |
|
|
Silt fence in rear is buried in places and broken in others. Mud has accumulated along curb.
|
ESC16-00032
| Aging Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 11:49:41 AM | | PASS |
|
|
|
ESC17-01796
| Site Final | 12/6/2018 | 12/10/2018 | 12/10/2018 11:39:46 AM | P | PASS |
|
|
|
ESC18-01466
| General Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 11:05:44 AM | P | PEND |
|
|
Hauling out backfill, some trackout. Talked witj foreman and he will make sure its cleaned up.
|
ESC17-00454
| Aging Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 10:46:27 AM | | CANC |
|
|
|
ESC17-00454
| DOC - Permit Finaled | 12/10/2018 | 12/10/2018 | 12/10/2018 10:46:22 AM | P | PASS |
|
|
|
ESC18-00476
| General Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 10:38:13 AM | P | PEND |
|
|
Met with foreman while on site. Will monitor east entrance for trackout, will close and force everyone to west entrance if trackout becomes problem. Has someone scheduled to come and repair silt fence.
|
ESC18-00828
| Tracking Control | 12/10/2018 | 12/10/2018 | 12/10/2018 9:53:38 AM | P | FAIL |
|
|
No entrance, site is half froze and muddy. Left message with listed RP Justin. Some tracking onto northview.
|
ESC18-00827
| Tracking Control | 12/10/2018 | 12/10/2018 | 12/10/2018 9:53:21 AM | P | FAIL |
|
|
No entrance, site is half froze and muddy. Left message with listed RP Justin. Some tracking onto northview.
|
ESC18-00411
| General Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 9:44:58 AM | P | PASS |
|
|
WIP on homes. Shared driveway is paved, no one accessing site through dirt. No tackout, site is contained.
|
ESC18-01327
| General Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 9:44:29 AM | P | PASS |
|
|
WIP on homes. Shared driveway is paved, no one accessing site through dirt. No tackout, site is contained.
|
ESC17-00395
| Aging Inspection | 12/10/2018 | 12/10/2018 | 12/10/2018 9:28:30 AM | | PASS |
|
|
No current construction. Few lots remain in back of development that haven't been started.
|