BLD13-03357
| BLD-Footing | 12/31/2013 | 12/31/2013 | 12/31/2013 3:56:16 PM | P | PASS |
|
|
Andy Phone #: ###-####
|
BLD13-02637
| BLD-Final | 12/30/2013 | 12/31/2013 | 12/31/2013 2:54:57 PM | P | PART |
|
|
Bob Phone #: ###-####. Ok for temp occ. Will be ok for perm. occ. once fire/life/safety signs perm.
|
BLD13-01287
| BLD-Wall cover | 12/31/2013 | 12/31/2013 | 12/31/2013 2:25:46 PM | P | PASS |
|
|
2nd floor, south units and central units ok to tape.
|
BLD13-01075
| BLD-Energy code compliance | 12/30/2013 | 12/31/2013 | 12/31/2013 1:32:26 PM | P | PASS |
|
|
Joe Phone #: ###-####
|
BLD13-01287
| BLD-Wall cover | 12/31/2013 | 12/31/2013 | 12/31/2013 10:02:43 AM | A | NR |
|
|
Moved to pm inspection.
|
GCB13-00160
| GCB-Footing | 12/30/2013 | 12/31/2013 | 12/31/2013 9:41:45 AM | A | FAIL |
|
|
J Jones ###-####. Noted several areas within the footing footprint were soils are not adequatley compacted. 6 to 12 inches in some areas. Either compact loose soils or excavate to endisturbed native soils.
|
BLD13-02671
| BLD-Wall Bracing | 12/30/2013 | 12/31/2013 | 12/31/2013 9:00:33 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen. braced walls 1st. floor ok. Contractor had engineering for repair of portal frame areas at 1st. floor. Will have scanned in.
|
ESC13-00492
| General Inspection | 12/31/2013 | 12/31/2013 | | | |
|
|
|