Inspections for the day of: Tuesday, December 31, 2013.
Number of inspections: 8
Percentage of inspections complete: 88 %
Percentage of inspections not complete: 13 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-03357 BLD-Footing12/31/201312/31/201312/31/2013 3:56:16 PMPPASS
Andy Phone #: ###-####
BLD13-02637 BLD-Final12/30/201312/31/201312/31/2013 2:54:57 PMPPART
Bob Phone #: ###-####. Ok for temp occ. Will be ok for perm. occ. once fire/life/safety signs perm.
BLD13-01287 BLD-Wall cover12/31/201312/31/201312/31/2013 2:25:46 PMPPASS
2nd floor, south units and central units ok to tape.
BLD13-01075 BLD-Energy code compliance12/30/201312/31/201312/31/2013 1:32:26 PMPPASS
Joe Phone #: ###-####
BLD13-01287 BLD-Wall cover12/31/201312/31/201312/31/2013 10:02:43 AMANR

Moved to pm inspection.
GCB13-00160 GCB-Footing12/30/201312/31/201312/31/2013 9:41:45 AMAFAIL
J Jones ###-####. Noted several areas within the footing footprint were soils are not adequatley compacted. 6 to 12 inches in some areas. Either compact loose soils or excavate to endisturbed native soils.
BLD13-02671 BLD-Wall Bracing12/30/201312/31/201312/31/2013 9:00:33 AMAPASS
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen. braced walls 1st. floor ok. Contractor had engineering for repair of portal frame areas at 1st. floor. Will have scanned in.
ESC13-00492 General Inspection12/31/201312/31/2013