FIR13-00604
| INSP-Sprinkler Rough-in | 2/10/2014 | 2/10/2014 | 2/10/2014 3:40:39 PM | P | PASS |
|
|
Piping is ok to cover at lay-in ceiling areas. I noted one overspace pendant and two possible painted heads.
|
BLD14-00129
| FIRE-Final Inspection | 2/7/2014 | 2/10/2014 | 2/10/2014 3:36:56 PM | P | FAIL |
|
|
Inspection was actually a conference to verify locations of exit signs. I also went over door hardware requirements
|
FIR14-00082
| INSP-Final Inspection | 2/7/2014 | 2/10/2014 | 2/10/2014 3:34:32 PM | A | PASS |
|
|
Permit finaled
|
FIR12-00326
| INSP-Final Inspection | 2/7/2014 | 2/10/2014 | 2/10/2014 11:21:21 AM | A | PASS |
|
|
Permit finaled. Map provided at the FACP and the Remote Annunciator
|
BLD13-03255
| FIRE-Final Inspection | 2/7/2014 | 2/10/2014 | 2/10/2014 11:15:33 AM | A | FAIL |
|
|
Need FIR permit for the hood suppression system and plans need to be resubmitted showing the actual wall layout and door locations for a revision of the exiting. Possible addition of exit signs and emergency lighting. Need to post occupant load signs.
|
BLD14-00012
| FIRE-Final Inspection | 2/7/2014 | 2/10/2014 | 2/10/2014 8:10:58 AM | A | PASS |
|
|
life safety passed
|