BLD19-03924
| BLD-Aging Inspection | 2/26/2020 | 2/26/2020 | 2/27/2020 8:47:16 AM | | DONE |
|
|
no contact since footing inspection//
|
BLD19-03433
| BLD-Aging Inspection | 2/26/2020 | 2/26/2020 | 2/27/2020 8:32:03 AM | | CANC |
|
|
|
BLD19-04058
| BLD-Aging Inspection | 2/26/2020 | 2/26/2020 | 2/27/2020 8:31:48 AM | | CANC |
|
|
|
BLD19-01048
| BLD-Conference | 2/26/2020 | 2/26/2020 | 2/27/2020 8:31:36 AM | P | DONE |
|
|
check on progess...//tried to make contact with owner--left message no response//assume it is a WIP//
|
BLD19-02844
| BLD-Final | 2/25/2020 | 2/26/2020 | 2/26/2020 3:19:57 PM | P | NR |
|
|
Steve Phone #: ###-####//need to change door per plan mod//
|
BLD20-00332
| BLD-Final | 2/26/2020 | 2/26/2020 | 2/26/2020 2:03:03 PM | P | DONE |
|
|
John Phone #: ###-####
|
BLD20-00332
| DOC - Permit Finaled | 2/26/2020 | 2/26/2020 | 2/26/2020 2:02:52 PM | P | PASS |
|
|
|
BLD19-04576
| BLD-Footing | 2/26/2020 | 2/26/2020 | 2/26/2020 1:39:58 PM | P | PART |
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru//WIP//setbacks appear to be ok//will check again at wall//
|
BLD18-03543
| BLD-Final | 2/24/2020 | 2/26/2020 | 2/26/2020 12:56:53 PM | P | DONE |
|
|
Kady Phone #: ###-####
|
BLD18-03543
| DOC - Permit Finaled | 2/26/2020 | 2/26/2020 | 2/26/2020 12:56:43 PM | P | PASS |
|
|
temp glass installed near door//final complete//
|
BLD20-00347
| BLD-Footing | 2/25/2020 | 2/26/2020 | 2/26/2020 12:32:46 PM | P | PART |
|
|
Francis Phone #: ###-####//corner pin located, setbacks appear to be ok per the drawings and side/back pin and relation to home//rebar installed//
|
MIS20-00045
| BLD-Conference | 2/12/2020 | 2/26/2020 | 2/26/2020 12:07:31 PM | A | DONE |
|
|
follow up on CN...
|
MIS20-00045
| DOC - Permit Finaled | 2/26/2020 | 2/26/2020 | 2/26/2020 12:07:22 PM | P | PASS |
|
|
permit was issued
|
BLD19-03693
| BLD-Final | 2/25/2020 | 2/26/2020 | 2/26/2020 11:05:54 AM | A | NR |
|
|
Christina Phone #: ###-####
|
BLD19-04205
| BLD-Framing/Rough-in | 2/25/2020 | 2/26/2020 | 2/26/2020 11:05:40 AM | A | PASS |
|
|
Christina Phone #: ###-####
|
BLD19-00527
| BLD-Framing/Rough-in | 2/24/2020 | 2/26/2020 | 2/26/2020 11:05:16 AM | A | PART |
|
|
INspection for 2nd floor approval to insulate walls and joists Phone #: ###-#### Inspection requested via web by Travis Blackburn//a couple joists need addressed//wrong hangers used for wide flange joists//will need to change and verify at insualtion inspection//ok to insulate only//
|
BLD20-00590
| BLD-Other | 2/25/2020 | 2/26/2020 | 2/26/2020 9:30:54 AM | A | DONE |
|
|
Final inspection on residential asphalt re-roof Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD20-00590
| DOC - Permit Finaled | 2/26/2020 | 2/26/2020 | 2/26/2020 9:30:44 AM | P | PASS |
|
|
new roof flashings installed//roofing appears to be installed within code requirements//
|
MIS20-00065
| BLD-Conference | 2/26/2020 | 2/26/2020 | 2/26/2020 9:25:44 AM | A | DONE |
|
|
correction notice posted//appears to be exterior siding and windows--new/ working on//appears to be a gut to the studs remodel// do not see any permits//check back 5 days//
|