BLD19-01190
| BLD-Aging Inspection | 2/28/2020 | 2/28/2020 | 3/4/2020 12:10:13 PM | | CANC |
|
|
|
BLD18-03781
| BLD-Aging Inspection | 2/28/2020 | 2/28/2020 | 3/4/2020 12:09:23 PM | | DONE |
|
|
Expires: 04/13/20
|
BLD19-04360
| BLD-Framing/Rough-in | 2/27/2020 | 2/28/2020 | 2/28/2020 4:20:29 PM | P | CANC |
|
|
Josh Phone #: ###-####
|
BLD20-00104
| BLD-Wall cover | 2/28/2020 | 2/28/2020 | 2/28/2020 4:20:17 PM | P | PASS |
|
|
Please call 30 minutes in advance Phone #: ###-#### Inspection requested via web by Chase Cheverton
|
BLD19-01513
| BLD-Final | 2/28/2020 | 2/28/2020 | 2/28/2020 3:42:06 PM | P | FAIL |
|
|
Fire Sprinkler Final this morning. Blower door test complete. Plans on Counter. Code 4646. Please Call Brad with status when complete. Thank you Phone #: ###-#### Inspection requested via web by Chris Laraway//corection notice posted--left with approved plans//
|
BLD19-03992
| BLD-Energy code compliance | 2/28/2020 | 2/28/2020 | 2/28/2020 2:59:15 PM | P | PASS |
|
|
Willie Phone #: ###-####
|
BLD19-03717
| BLD-Final | 2/28/2020 | 2/28/2020 | 2/28/2020 2:57:42 PM | P | PASS |
|
|
|
BLD19-03717
| DOC - Permit Finaled | 2/28/2020 | 2/28/2020 | 2/28/2020 2:57:32 PM | P | PASS |
|
|
|
BLD19-03717
| BLD-Blower Door Test Results | 2/28/2020 | 2/28/2020 | 2/28/2020 2:57:17 PM | P | DONE |
|
|
3.72 ACH 50
|
BLD19-04993
| BLD-Conference | 2/28/2020 | 2/28/2020 | 2/28/2020 2:37:24 PM | P | DONE |
|
|
Would like an inspection, the foundation is poured and ready for backfill. Phone #: ###-#### Inspection requested via web by Melissa Davies//talked with Melissa, scheduled inspection for damp proofing//let her know city of Boise typically does not inspect the damp proofing prior to backfill//next inspection would be wall bracing//
|
BLD18-04520
| BLD-Framing/Rough-in | 2/28/2020 | 2/28/2020 | 2/28/2020 2:31:54 PM | P | PASS |
|
|
tower 2 // Chris Phone #: ###-#### Inspection requested via web by Brittany Hill//fire caulk added as we walked through//need gyp board behind ada shower//add blocking for ada bathroom units 105 and 106//ok to insulate//
|
BLD20-00603
| BLD-Final | 2/28/2020 | 2/28/2020 | 2/28/2020 1:29:25 PM | P | DONE |
|
|
Demo complete. Thank you! Phone #: ###-#### Inspection requested via web by Dale Hope//ok// need steps at side door where concrete was removed//let guy onsite know//looks like minor interior work paint, flooring etc//let him know a plumbing permit is needed for the new sink fixtures//
|
BLD20-00603
| DOC - Permit Finaled | 2/28/2020 | 2/28/2020 | 2/28/2020 1:24:09 PM | P | PASS |
|
|
demo complete//will need steps at side door where concrete was removed//
|
BLD19-04526
| BLD-Wall Bracing | 2/26/2020 | 2/28/2020 | 2/28/2020 12:38:37 PM | A | PASS |
|
|
Willy Phone #: ###-####nailing ok//need to add 3x blocking at engineered shear walls--check at framing//
|
BLD19-03259
| BLD-Final | 2/27/2020 | 2/28/2020 | 2/28/2020 11:38:04 AM | A | PASS |
|
|
Please call 30 minutes prior to arrival. Phone #: ###-#### Inspection requested via web by Kenneth Lamm
|
BLD19-03259
| DOC - Permit Finaled | 2/28/2020 | 2/28/2020 | 2/28/2020 11:37:53 AM | P | PASS |
|
|
smoke and co detectors installed//interconnected per the owner//
|
BLD20-00003
| BLD-Energy code compliance | 2/26/2020 | 2/28/2020 | 2/28/2020 11:27:25 AM | A | PART |
|
|
Todd Phone #: ###-####//fix insulation as noted on floor in red//ok to cover when fixed//
|
BLD20-00003
| BLD-Framing/Rough-in | 2/26/2020 | 2/28/2020 | 2/28/2020 11:26:50 AM | A | PASS |
|
|
Todd Phone #: ###-####
|
BLD20-00459
| BLD-Final | 2/25/2020 | 2/28/2020 | 2/28/2020 11:04:28 AM | A | DONE |
|
|
Inspection requested via web by Hans Weikl
|
BLD20-00459
| DOC - Permit Finaled | 2/28/2020 | 2/28/2020 | 2/28/2020 11:04:17 AM | P | PASS |
|
|
roof complete--appears to be installed within code requirements//no access to back//
|
BLD19-04205
| BLD-Energy code compliance | 2/27/2020 | 2/28/2020 | 2/28/2020 10:53:42 AM | A | PASS |
|
|
Chrisitna Phone #: ###-####
|
BLD19-03717
| BLD-Final | 2/27/2020 | 2/28/2020 | 2/28/2020 10:39:58 AM | A | NR |
|
|
Robert Phone #: ###-####///need blower door test//attic access located in garage and attic can be accessed througout the home//CN posted//
|
BLD19-01549
| BLD-Final | 2/27/2020 | 2/28/2020 | 2/28/2020 9:54:28 AM | A | NR |
|
|
jack Phone #: ###-####//need to update project description--no sprinklers--no alarms in unit//no smoke detectors in unit//need approved plans onsite//need fire life safety inspection and plumbing, mechanical inspections//
|
BLD19-03214
| BLD-Final | 2/27/2020 | 2/28/2020 | 2/28/2020 9:09:51 AM | A | NR |
|
|
Jeff Phone #: ###-####//need blower door test//ok otherwise//
|
BLD19-03197
| BLD-Final | 2/27/2020 | 2/28/2020 | 2/28/2020 9:09:25 AM | A | NR |
|
|
Jeff Phone #: ###-####//install attic access door//insulate crawl access door//seal penetrations through garage separation wall//provide blower door test//CN posted//
|
BLD19-03006
| BLD-Final | 2/27/2020 | 2/28/2020 | 2/28/2020 9:08:26 AM | A | NR |
|
|
Jeff Phone #: ###-####//fill out insulation cert//need blower door test//CN posted//
|
MIS20-00051
| BLD-Conference | 2/21/2020 | 2/28/2020 | 2/28/2020 8:25:47 AM | A | FAIL |
|
|
follow up..check for permits...//plumbing permit open//still waiting for other permits......//check back 5 days//
|