ESC16-01368
| BMP Violation | 2/3/2017 | 2/6/2017 | 2/9/2017 9:29:41 AM | P | FAIL |
|
|
No identifiable effort of clean up. ACHD inspector was onsite this morning 2/9 and observed a crane on site working. Notice of violation of SWO verbally disclosed, RP stated it could be they were removing concrete forms.
Corrections:
-Clean up Bella Street & sidewalk with all means practical. No rinsing -Install sediment filter bag or fiber mat in inlet on 29th & Bella - Pay re-inspection fee
- Additional penalties pending
|
ESC16-00935
| Complaint Inspection | 2/6/2017 | 2/6/2017 | 2/6/2017 10:09:48 AM | A | PEND |
|
|
Concern about runoff accumulating at bottom of slope on lot potentially damaging stability of slope below silt fence.
WIP to conduct maintenance on silt fence and wattle at bottom of hill by removing captured mud. RP and excavator to install additional wattles up hill to divert flows offsite to the vegetated perimter.
|
ESC15-00609
| Aging Inspection | 2/6/2017 | 2/6/2017 | 2/6/2017 7:56:59 AM | | CANC |
|
|
|