FIR19-00353
| INSP-Sprinkler Rough-in/Hydro | 3/10/2020 | 3/10/2020 | 3/10/2020 3:20:20 PM | P | CANC |
|
|
Please give me a call it will be for standpipe 2nd through 4th. as late in day as possible Phone #: ###-#### Inspection requested via web by jeremiah robison
|
FIR19-00816
| INSP-Sprinkler Rough-in | 3/10/2020 | 3/10/2020 | 3/10/2020 1:36:23 PM | P | PART |
|
|
Rough-in on towers three and four building 11 passed but the tenting failed due to piping that needs "boxed" in in locations in each apartment as discussed. Piping can be covered on the first and second floors. Piping can not be covered on third floor until tenting is modified. ]Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR19-00492
| DOC - Permit Finaled | 3/10/2020 | 3/10/2020 | 3/10/2020 1:29:07 PM | P | PASS |
|
|
permit finaled
|
BLD20-00388
| FIRE-Final Inspection | 3/9/2020 | 3/10/2020 | 3/10/2020 12:42:26 PM | A | FAIL |
|
|
The door hardware and the annual inspection for the fire sprinkler system is ok but the fire alarm panel is in trouble with a phone line 2 fault. Robert Phone #: ###-####
|
FIR19-00886
| INSP-Sprinkler Rough-in | 3/9/2020 | 3/10/2020 | 3/10/2020 12:41:21 PM | A | PASS |
|
|
See approved plans for additional heads marked ok in the hard lids where piping is ok for cover. Tom Phone #: ###-####
|
FIR20-00106
| INSP-Final Inspection | 3/10/2020 | 3/10/2020 | 3/10/2020 9:42:16 AM | P | CANC |
|
|
Not ready due to the fire alrm interconnect not being complete. Nate Phone #: ###-####
|
FIR19-00511
| INSP-Final Inspection | 3/10/2020 | 3/10/2020 | 3/10/2020 9:34:29 AM | P | PASS |
|
|
Permit finaled.
|
BLD18-03695
| FIRE-Final Inspection | 3/9/2020 | 3/10/2020 | 3/10/2020 9:32:22 AM | A | PASS |
|
|
Life safety passed.
Mark Phone #: ###-####
|