FIR11-00452
| INSP-Final Inspection | 3/15/2013 | 3/15/2013 | 3/15/2013 3:53:56 PM | P | PASS |
|
|
permit finaled
|
FIR12-00582
| FIR-Aging Inspection | 3/15/2013 | 3/15/2013 | 3/15/2013 3:39:56 PM | | NR |
|
|
work is in progress
|
FIR12-00610
| FIR-Aging Inspection | 3/15/2013 | 3/15/2013 | 3/15/2013 3:38:11 PM | | NR |
|
|
work is in progress
|
FIR12-00588
| INSP-Final Inspection | 3/15/2013 | 3/15/2013 | 3/15/2013 3:27:59 PM | P | PASS |
|
|
Permit finaled
|
FIR13-00070
| INSP-Sprinkler Rough-in/Hydro | 3/14/2013 | 3/15/2013 | 3/15/2013 3:27:03 PM | P | FAIL |
|
|
Hydro test of the wet system failed due to visable leakage at the drain weld on the riser. Earth quake bracing needs to be modifed as discussed and connected to the main piping instead of the lateral bracing. Plans need to be resubmitted showing the actual grid piping layout. We were unable to get the dry system to pump up to perform a hydro test. Rough-in inspection for the piping as installed passed.
|
FIR12-00574
| INSP-Sprinkler Rough-in/Hydro | 3/14/2013 | 3/15/2013 | 3/15/2013 3:21:43 PM | A | PASS |
|
|
Under ground hydro test passed.
|
BLD13-00126
| FIRE-Final Inspection | 3/15/2013 | 3/15/2013 | 3/15/2013 3:18:44 PM | P | FAIL |
|
|
Pendant sprinkler head is overspaced off the face of the new office door. All other items appear ok.
|
BLD12-01984
| FIRE-Final Inspection | 3/14/2013 | 3/15/2013 | 3/15/2013 1:44:44 PM | P | PASS |
|
|
Life safety passed
|
FIR12-00744
| INSP-Final Inspection | 3/14/2013 | 3/15/2013 | 3/15/2013 1:17:06 PM | A | PASS |
|
|
permit finaled
|
BLD12-03326
| FIRE-Final Inspection | 3/14/2013 | 3/15/2013 | 3/15/2013 10:03:48 AM | A | PASS |
|
|
life safety passed
|
FIR12-00433
| INSP-Alarm Testing | 3/13/2013 | 3/15/2013 | 3/15/2013 9:08:44 AM | A | FAIL |
|
|
The approved "plan modification" drawings are not provided, pull station is too high, batteries are too small, sample tubes are too short (per silent knight tech support), need as-builts showing the deleted devices, per conversation only one of the hvac unit shuts down immediately upon detection of smoke. No actual testing was performed.
|