Inspections for the day of: Monday, March 20, 2017.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01138 General Inspection3/20/20173/20/20173/22/2017 3:54:56 PM PASS
WIP. No ESC issues observed.
ESC14-00657 General Inspection3/20/20173/20/20173/20/2017 4:26:29 PM PASS
WIP on SFHs. Sub ok. No corrections.
ESC15-01391 General Inspection3/20/20173/20/20173/20/2017 3:50:29 PM CANC
ESC15-01224 General Inspection3/20/20173/20/20173/20/2017 3:50:29 PM PASS
Walk through with RP on site. Project nearing completion. Minimal earth disturbance. Perimeter of job site is clean. Concrete washout is full RP has maintenance scheduled. SWPPP inspections are up to date.
ESC17-00286 Site Preparation3/20/20173/20/20173/20/2017 3:04:34 PMPPASS
Met onsite with RP. Discussed concrete washout, trackout, keeping sidewalk and surroundings clean. Site has a 30-40ft vegetated buffer between the creek and a small buffer strip between the sidewalk and the disturbance. Oaky to start.
ESC16-00385 General Inspection3/20/20173/20/20173/20/2017 2:32:30 PMPPASS
Soil not yet stable. Revegetation stage. project ok. No corrections requested.
ESC16-01654 General Inspection3/20/20173/20/20173/20/2017 2:20:54 PMPPASS
Demolition in progress. No trackout. BMPs are maintained and ok. No corrections requested.
ESC16-00852 Site Final3/20/20173/20/20173/20/2017 2:16:34 PMPPASS
ESC16-00852 General Inspection3/20/20173/20/20173/20/2017 2:16:19 PMPPASS
Project complete. Soil stable. Okay to final.
ESC15-01004 General Inspection3/20/20173/20/20173/20/2017 2:14:39 PM PASS
No ESC issues observed.
ESC17-00066 Site Preparation3/17/20173/20/20173/20/2017 1:54:49 PMPPASS
DI bag installed, construction entrance installed, sign posted. Okay to start. Watch for trackout onto Boise Ave.
ESC14-00626 Site Final3/20/20173/20/20173/20/2017 11:09:08 AMAPASS
ESC14-00626 Aging Inspection3/20/20173/20/20173/20/2017 11:08:45 AM PASS
Vegetation complete. Soil stable. Okay to final
ESC16-00021 Site Final3/20/20173/20/20173/20/2017 11:00:23 AMPPASS
ESC16-00021 Aging Inspection3/20/20173/20/20173/20/2017 11:00:04 AM PASS
Project complete. Soil stable. Okay to final
ESC15-00378 General Inspection3/20/20173/20/20173/20/2017 10:58:50 AM PASS
Vegetation phase. Vegetation has not reached 70% cover. Project ok.
ESC16-00406 General Inspection3/20/20173/20/20173/20/2017 10:25:09 AM PASS
The ECBs are providing adequate soil stabilization. Vegetation has begun to establish over much of the hillsides throughout the subdivision. The scour area on 8th street extension has been stabilized with ECBs there is some sediment deposited on the top of the ECBs.
Corrections: The Highlands Cover Rd. entrance needs to be sweep, the construction entrance needs maintenance, the DI bags need maintenance.