BLD15-01523
| BLD-Aging Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 4:04:40 PM | | PASS |
|
|
|
BLD15-01523
| DOC - Permit Finaled | 3/30/2016 | 3/30/2016 | 3/30/2016 3:30:45 PM | P | PASS |
|
|
|
BLD14-00556
| BLD-Final | 3/30/2016 | 3/30/2016 | 3/30/2016 3:30:29 PM | P | PASS |
|
|
Xavier Phone #: ###-#### fire ok per scott. exit signage ok
|
BLD15-04406
| BLD-Final | 3/30/2016 | 3/30/2016 | 3/30/2016 2:45:51 PM | P | PASS |
|
|
greg Phone #: ###-#### final ok
|
BLD15-03428
| BLD-Ceiling Grid Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 2:03:07 PM | P | PASS |
|
|
Kenny Phone #: ###-####
|
BLD14-02837
| BLD-Framing/Rough-in | 3/30/2016 | 3/30/2016 | 3/30/2016 1:47:57 PM | P | PASS |
|
|
CBRA Rm, baggage handling area, call for access - Lee Phone #: ###-#### interior wall ok to cover
|
BLD16-00669
| BLD-Footing | 3/29/2016 | 3/30/2016 | 3/30/2016 1:29:33 PM | P | PASS |
|
|
Pat Phone #: ###-#### rebar onley in pf
|
BLD16-00482
| BLD-Foundation | 3/29/2016 | 3/30/2016 | 3/30/2016 11:35:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jared Waggoner
|
BLD16-00833
| BLD-Framing/Rough-in | 3/29/2016 | 3/30/2016 | 3/30/2016 11:26:31 AM | A | PASS |
|
|
Jeff Phone #: ###-####
|
BLD16-00307
| BLD-Conference | 3/29/2016 | 3/30/2016 | 3/30/2016 11:10:48 AM | A | PART |
|
|
Rebar inspection for encasement of conduits. Column rebar at 19-24 grids between M.5 and B. Phone #: ###-#### Inspection requested via web by Dan Koski rebar ok/clearance ok / pending slope footting engineering aproval
|
BLD16-00269
| BLD-Framing/Rough-in | 3/29/2016 | 3/30/2016 | 3/30/2016 10:02:40 AM | A | PART |
|
|
Phone #: 2088304926 >> Inspection requested via mobile web by Morgan Fitzgerald c/n isued ok to insulate
|
BLD14-01821
| BLD-Conference | 3/29/2016 | 3/30/2016 | 3/30/2016 9:36:47 AM | A | PART |
|
|
Access locations into attic and lighting in garage soffit. Phone #: ###-#### Inspection requested via web by Corey Hockersmith accesses to be adressed by arch/ lights ok as discused
|
BLD15-04102
| BLD-Energy code compliance | 3/29/2016 | 3/30/2016 | 3/30/2016 9:04:00 AM | A | PASS |
|
|
Shane Phone #: ###-#### pending mech insp/
|
BLD11-01914
| BLD-Aging Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 8:31:34 AM | | FAIL |
|
|
Jeff Phone #: ###-#### Brian Murphy said it’s too late for them to do an inspection so PW will NOT approve it. He said he would (possibly) accept a letter from the engineer that he saw everything go in and it was installed per plan… but the possibly because it was so long ago. If they are going to go that route the engineer should call Brian to see what he wants on the letter.
|
BLD16-00396
| BLD-Other | 3/29/2016 | 3/30/2016 | 3/30/2016 12:00:00 AM | A | CANC |
|
|
HI -- Need to schedule an erosion pre-con meeting tomorrow morning with Evan & Steve Hanson on site. Thanks Phone #: ###-#### >> Inspection requested via web by Kim Winkle
|