Inspections for the day of: Wednesday, March 6, 2019.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-04859 Final3/6/20193/6/20193/6/2019 1:58:53 PMPNH
Call first Phone #: ###-#### Inspection requested via web by Stuart Welton No access. Electrician was told someone would be on-site.
ELE16-01424 ELE-Aging Inspection3/6/20193/6/20193/6/2019 1:35:14 PM PASS
This inspection was for RI only of future solar install. Drove by, no solar installed. If solar is installed, it will require a new permit to be pulled.
ELE16-01424 Final3/6/20193/6/20193/6/2019 1:33:58 PMPPASS
Alt Energy Ok final. RI only was done for future solar installation. If solar is installed, and new permit must be pulled.
ELE18-03325 Final3/5/20193/6/20193/6/2019 1:32:16 PMPPASS
we just put led heads on the 4poles. All DLC listed.
https://www.eiko.com/category/920/DTD-60!2fC0!2f850-GY-U

want to clear up some older permits Phone #: ###-#### Inspection requested via web by Tim Dunlop Ok final 4 existing pole lights that were equipt with new LED lights.
ELE19-00645 Rough-In Permanent Service3/6/20193/6/20193/6/2019 1:00:25 PMPPASS
Phone #: ###-#### Inspection requested via web by Greg Idsinga p/s u/g n ok
ELE18-01606 Electrical Rough-In3/4/20193/6/20193/6/2019 12:35:07 PMAPART
Second floor D units, rough in and ceilings inspection. Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover 2nd floor Bldg D. For future inspections, all walls will need to be open. 2nd floor exterior walls were insulated. All terminal barriers in panels were installed.
ELE18-03035 Final3/5/20193/6/20193/6/2019 11:25:44 AMAPASS
All doors and garages will be open for you Phone #: ###-#### Inspection requested via web by David Kubik Ok final.
ELE18-03036 Final3/5/20193/6/20193/6/2019 11:25:28 AMAPASS
Phone #: ###-#### Inspection requested via web by David Kubik Ok final.
ELE18-03547 Final3/5/20193/6/20193/6/2019 11:25:13 AMAPASS
Thank you sir Phone #: ###-#### Inspection requested via web by David Kubik Ok final.
ELE19-00779 Conference3/5/20193/6/20193/6/2019 10:47:45 AMADONE
Joshua Phone #: ###-#### Discussed moving service to S side of house to allow for a mstr suite addition. 50a temp power to existing service location will need to be GFI protected.
ELE19-00518 Permanent Service3/5/20193/6/20193/6/2019 10:25:31 AMAPASS
House is open and empty. Call Darren with any questions ###-####
Service is on the south side of the house Phone #: ###-#### Inspection requested via web by Clayton Morgan t/s o/h n ok
ELE19-00785 Temporary Service3/5/20193/6/20193/6/2019 9:55:11 AMAPASS
Phone #: ###-#### Inspection requested via web by kevin blackmon t/s u/g n ok
ELE19-00195 Permanent Service3/5/20193/6/20193/6/2019 9:16:08 AMAPASS
Brian ###-#### Verified there are 2 ground rods. p/s o/h n ok
ELE19-00786 Rough-In Permanent Service3/6/20193/6/20193/6/2019 9:14:43 AMAPASS
Phone #: ###-#### Inspection requested via web by Kevin Heideman p/s u/g n ok
ELE18-01818 Final3/5/20193/6/20193/6/2019 8:27:29 AMAPASS
Dan Cromie ###-####. Need to verify AFC. Ok final. Received pic from Dan showing AFC.
ELE19-00773 Final3/5/20193/6/20193/6/2019 6:12:25 AMAPASS
Robert ###-####. Left message with Robert. Ok final. Talked to Robert, a bad 2-pole 15a breaker was replaced for new mini split. GFI service recept was installed within NEC requirements
ELE19-00726 Final3/5/20193/6/20193/5/2019 2:43:42 PMAPASS