ELE16-00717
| Final | 3/5/2019 | 3/7/2019 | 3/7/2019 2:09:22 PM | A | CANC |
|
|
Please contact electrician Mick @ ###-#### prior to inspection to have him meet you at location to go over what was completed. There was some confusion whether or not this was a state or city permit so this inspection was not resolved sooner. Phone #: ###-#### Inspection requested via web by SHAWN TOMLINSON Need to verify if state or city owned permit for inspections, work space clearences not met with concrete support in front of main breaker in generator
|
ELE19-00738
| Electrical Rough-In | 3/7/2019 | 3/7/2019 | 3/7/2019 1:59:56 PM | P | PASS |
|
|
Wall rough in Phone #: ###-#### Inspection requested via web by kendall bender Wall with future power for projector on south side half wall ok to cover
|
ELE16-03000
| Conference | 3/7/2019 | 3/7/2019 | 3/7/2019 1:49:38 PM | P | DONE |
|
|
Nick Phone #: ###-#### Needed extension and will clone it
|
ELE16-03000
| ELE-Request for Extension | 3/7/2019 | 3/7/2019 | 3/7/2019 1:49:29 PM | P | PASS |
|
|
Nick Phone #: ###-#### Granted 180 day extension
|
ELE19-00678
| Rough-In Permanent Service | 3/5/2019 | 3/7/2019 | 3/7/2019 1:46:44 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by shane miller Metering device required
|
ELE19-00203
| Final | 3/6/2019 | 3/7/2019 | 3/7/2019 1:21:44 PM | A | FAIL |
|
|
Please call number above for fence and gear lock codes or call ###-#### Phone #: ###-#### Inspection requested via web by Kevin Perez Available fault current calc required GF performance test required for 480v 1000 amp systems
|
ELE19-00641
| Electrical Rough-In | 3/6/2019 | 3/7/2019 | 3/7/2019 12:46:55 PM | A | PASS |
|
|
Inspection for Bonding, Under ground and Water Bonding Any questions please call Louis at ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller u/g and bonding of 4 corners and light,diving board,cover,and back to equipment ok to cover
|
ELE18-03385
| Electrical Rough-In | 3/7/2019 | 3/7/2019 | 3/7/2019 11:16:35 AM | A | PASS |
|
|
Rough in for cover in building J breezeway''s and rise room. Contact Scott Wilson. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Brrezeway and riser room ok to cover
|
ELE18-03978
| Final | 3/6/2019 | 3/7/2019 | 3/7/2019 11:03:19 AM | A | PASS |
|
|
This project should have been finaled when it passed inspection for permanent service for panel fire. Please call with any questions.
Thank you ; have a nice day! Karin ###-#### Phone #: ###-#### Inspection requested via web by JENNY EMEL Final ok
|