BLD19-04805
| BLD-Framing/Rough-in | 3/6/2020 | 3/9/2020 | 3/9/2020 4:18:43 PM | P | CANC |
|
|
Tom- underfloor framing Phone #: ###-####//no one onsite//no framing has been done//
|
BLD19-02364
| BLD-Framing/Rough-in | 3/5/2020 | 3/9/2020 | 3/9/2020 4:17:52 PM | P | PART |
|
|
Kirk Phone #: ###-####//need to addd bearing as discussed for rafter tails on bearing walls and beam over bathtub//provide information on insulation used to determine the r values//
|
BLD19-04775
| BLD-Final | 3/6/2020 | 3/9/2020 | 3/9/2020 2:57:15 PM | P | PASS |
|
|
Onsite contact (Blue Raven Solar Special Technician) Please call our onsite contact with any questions, or to coordinate arrival time.Mierins Rozental-###-#### Homeowner will also be home to provide access. System is ready to be inspected. Phone #: ###-#### Inspection requested via web by BRS Permitting//ok per plans//
|
BLD19-04775
| DOC - Permit Finaled | 3/9/2020 | 3/9/2020 | 3/9/2020 2:56:54 PM | P | PASS |
|
|
|
BLD20-00617
| BLD-Energy code compliance | 3/9/2020 | 3/9/2020 | 3/9/2020 2:13:50 PM | P | PASS |
|
|
Brooks Phone #: ###-####
|
BLD19-03624
| BLD-Framing/Rough-in | 3/9/2020 | 3/9/2020 | 3/9/2020 1:48:33 PM | P | PASS |
|
|
stacy Phone #: ###-####
|
BLD20-00816
| BLD-Final | 3/9/2020 | 3/9/2020 | 3/9/2020 1:24:18 PM | P | DONE |
|
|
Nicole Phone #: ###-####
|
BLD20-00816
| DOC - Permit Finaled | 3/9/2020 | 3/9/2020 | 3/9/2020 1:24:08 PM | P | PASS |
|
|
no access to back//steel roofinng appears to be installed per description//roofing appears to be installed within code requirements//no access to walk roof and roof is low slope//
|
BLD19-00527
| BLD-Framing/Rough-in | 3/6/2020 | 3/9/2020 | 3/9/2020 12:55:57 PM | A | PART |
|
|
Second reinspection for 1st floor of bldg B Phone #: ###-#### Inspection requested via web by Travis Blackburn//1st floor framing corrections made//call for energy//
|
BLD19-04366
| BLD-Foundation | 3/6/2020 | 3/9/2020 | 3/9/2020 11:01:50 AM | A | PASS |
|
|
Bruce-stem wall foundation Phone #: ###-####//pending specials//
|
BLD19-01303
| BLD-Framing/Rough-in | 3/6/2020 | 3/9/2020 | 3/9/2020 9:43:11 AM | A | FAIL |
|
|
Shear wall and Framing inspection Approved plans are on site in the fire place. Phone #: ###-#### Inspection requested via web by Oleksiy Yanchuk//CN posted//need hot dip galvanized nails in pt//need access to columns to verify attachments per plans//straps need added opposite side of sheating on all portal frame per details on plans//need truss plans//
|
BLD19-02844
| BLD-Final | 3/9/2020 | 3/9/2020 | 3/9/2020 9:16:48 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steve Jones//complete per plans and plan modifications//
|
BLD19-02844
| DOC - Permit Finaled | 3/9/2020 | 3/9/2020 | 3/9/2020 9:16:21 AM | P | PASS |
|
|
|