FIR13-00597
| INSP-Sprinkler Rough-in | 4/10/2014 | 4/11/2014 | 4/11/2014 3:02:25 PM | P | PART |
|
|
Need to provide plan modification to include additional heads and branchlines below ductwork in the new warehouse area.
|
FIR13-00713
| INSP-Sprinkler Rough-in | 4/10/2014 | 4/11/2014 | 4/11/2014 3:00:29 PM | A | PART |
|
|
South building 1st and 2nd floor overhead rough-in okayed for cover. One missing hanger added while on site, need to provide matched temp SW heads in the common stairways, patio SW heads to match plan submittals. Third floor cover approval pending tenting and insulation.
|
BLD13-03275
| FIRE-Final Inspection | 4/10/2014 | 4/11/2014 | 4/11/2014 2:56:04 PM | A | PASS |
|
|
Verified noted items completed. Life safety inspection passed.
|
BLD14-00332
| FIRE-Conference | 4/11/2014 | 4/11/2014 | 4/11/2014 10:04:14 AM | A | DONE |
|
|
On site conference regarding approved plan notes, fire code review comments, project schedule, min. conditions for fire life safety inspection approval, project related trade work, etc.
|
FIR14-00135
| INSP-Final Inspection | 4/11/2014 | 4/11/2014 | 4/11/2014 10:01:49 AM | A | PASS |
|
|
Scope of fire alarm work passed functional testing. After hours inspection request completed. Permit finaled.
|
FIR13-00668
| INSP-Sprinkler Rough-in/Hydro | 4/7/2014 | 4/11/2014 | 4/11/2014 9:57:58 AM | A | PASS |
|
|
Completed after hours fire alarm inspection for recall and shunt trip functions per the scope of work indicated.
|
FIR14-00141
| INSP-Final Inspection | 4/9/2014 | 4/11/2014 | 4/11/2014 12:00:00 AM | A | CANC |
|
|
tim Phone #: ###-####
|