ELE19-01043
| Final | 4/19/2019 | 4/19/2019 | 4/19/2019 2:11:11 PM | P | PASS |
|
|
Code 2010 Phone #: ###-#### Inspection requested via web by Jason Wicks Final ok
|
ELE19-00652
| Electrical Rough-In | 4/19/2019 | 4/19/2019 | 4/19/2019 1:43:02 PM | P | PART |
|
|
grid ceiling Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Kitchen and office grid only rough in ok cover
|
ELE19-01352
| Rough-In Permanent Service | 4/19/2019 | 4/19/2019 | 4/19/2019 1:08:13 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Rough in ok cover p/s u/g n ok
|
ELE19-00984
| Electrical Rough-In | 4/18/2019 | 4/19/2019 | 4/19/2019 11:29:29 AM | A | NR |
|
|
Underground inspection please. Any questions you can call Dustin @ ###-####. Phone #: ###-#### Inspection requested via web by Sherry Allen Underground has not been installed yet. The ground has not been disturbed on any corner of this intersection.
|
ELE19-01414
| Electrical Rough-In | 4/18/2019 | 4/19/2019 | 4/19/2019 10:51:54 AM | A | PASS |
|
|
New conduits were installed in trench, from shop to home, buried at 18" to top of conduits. Trench is open for inspection. back yard is accessible for your inspection. Inspection requested via web by Kurt Carlson Underground noted rough in ok cover
|
ELE19-01222
| Final | 4/18/2019 | 4/19/2019 | 4/19/2019 10:38:37 AM | A | PASS |
|
|
Please call ahead Phone #: ###-#### Inspection requested via web by BRS Permitting Final ok
|
ELE19-00934
| Electrical Rough-In | 4/18/2019 | 4/19/2019 | 4/19/2019 9:18:38 AM | A | FAIL |
|
|
Ceiling rough-in Phone #: ###-#### Inspection requested via web by Steven Ragan 300.11- Support wires used to support cables and raceways shall be secured at both ends. 314.25- Boxes covers shall be installed. break room top of wall.
|