FIR19-00785
| INSP-Sprinkler Rough-in | 4/29/2020 | 4/29/2020 | 4/29/2020 4:02:09 PM | P | FAIL |
|
|
Todays inspection was for the heat trace on the cpvc piping in the breeze ways. Only acouple of the provided documents had the city approval stamp on them. At re-inspection all documents to have the approval stamp. Also the provided documentation specifically addresses the wire to be used on metallic piping. No where did it show to be used on the CPVC. The contractor needs to provide documentation this product can be used on CPVC piping or resubmit another product that can be used.
Tanner Phone #: ###-####
|
BLD19-02939
| FIRE-Final Inspection | 4/28/2020 | 4/29/2020 | 4/29/2020 2:04:10 PM | P | FAIL |
|
|
Still need the emergency lights repaired for a life safety final.
Screened-ARMANDO Phone #: ###-####
|
FIR20-00202
| INSP-Final Inspection | 4/28/2020 | 4/29/2020 | 4/29/2020 10:49:31 AM | A | FAIL |
|
|
For a final we need to test the last two duct smoke detectors, test PIV and retest the water soaked backflow tamper switch.
Project Manager Randy Burkland Store now requiring vendors to were face mask and check in at store Phone #: ###-#### Inspection requested via web by Bruce Sullivan
|
BLD19-00413
| FIRE-Final Inspection | 4/23/2020 | 4/29/2020 | 4/29/2020 10:48:15 AM | A | FAIL |
|
|
Provide revised floor plan, provide info to plan review on mezzanine storage, provide single action hardware on exterior doors as discussed, provide automatic flush bolts and sticker at main exit.
screened- Marcus Phone #: ###-####
|