Inspections for the day of: Wednesday, April 29, 2020.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR19-00785 INSP-Sprinkler Rough-in4/29/20204/29/20204/29/2020 4:02:09 PMPFAIL
Todays inspection was for the heat trace on the cpvc piping in the breeze ways. Only acouple of the provided documents had the city approval stamp on them. At re-inspection all documents to have the approval stamp. Also the provided documentation specifically addresses the wire to be used on metallic piping. No where did it show to be used on the CPVC. The contractor needs to provide documentation this product can be used on CPVC piping or resubmit another product that can be used.

Tanner Phone #: ###-####
BLD19-02939 FIRE-Final Inspection4/28/20204/29/20204/29/2020 2:04:10 PMPFAIL
Still need the emergency lights repaired for a life safety final.

Screened-ARMANDO Phone #: ###-####
FIR20-00202 INSP-Final Inspection4/28/20204/29/20204/29/2020 10:49:31 AMAFAIL
For a final we need to test the last two duct smoke detectors, test PIV and retest the water soaked backflow tamper switch.

Project Manager Randy Burkland
Store now requiring vendors to were face mask and check in at store Phone #: ###-#### Inspection requested via web by Bruce Sullivan
BLD19-00413 FIRE-Final Inspection4/23/20204/29/20204/29/2020 10:48:15 AMAFAIL
Provide revised floor plan, provide info to plan review on mezzanine storage, provide single action hardware on exterior doors as discussed, provide automatic flush bolts and sticker at main exit.

screened- Marcus Phone #: ###-####