ESC16-00868
| Site Final | 3/31/2017 | 4/7/2017 | 4/7/2017 3:09:51 PM | P | FAIL |
|
|
No corrections that were requested have been done. No response from RP from previous message. Follow up with BMP violation inspection next week.
|
ESC16-00989
| BMP Violation | 4/5/2017 | 4/7/2017 | 4/7/2017 2:58:47 PM | A | PART |
|
|
DI bags have been maintenance. There is still sediment on the sidewalk.
|
ESC15-01543
| General Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 2:56:51 PM | | PASS |
|
|
WIP on SFH. Perimeter controls are maintained, trash is controlled. Project ok.
|
ESC11-00879
| General Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 2:55:20 PM | | PASS |
|
|
WIP on SFH and clubhouse. BMPS okay. Trash contained
|
ESC16-01083
| Site Final | 4/7/2017 | 4/7/2017 | 4/7/2017 1:49:05 PM | P | PASS |
|
|
|
ESC16-01083
| Aging Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 1:48:49 PM | | PASS |
|
|
Project compelte okay to final.
|
ESC13-00806
| General Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 1:08:33 PM | | PASS |
|
|
No changes in project. Okay
|
ESC16-00953
| General Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 12:11:52 PM | | PASS |
|
|
Silt fence ok. No trackout. No corrections.
|
ESC16-00935
| General Inspection | 4/5/2017 | 4/7/2017 | 4/7/2017 11:43:54 AM | A | PEND |
|
|
No new developments. Fence still not finished.
|
ESC15-01288
| General Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 10:43:19 AM | | PEND |
|
|
WIP on SFHs. Some trackout. DI bags ok. Concrete washout in use and ok. Drainage channel severely eroded in the center channel. The pond has sediment in the bottom.
|
ESC15-00142
| General Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 10:38:08 AM | | CANC |
|
|
|
ESC16-01082
| Site Final | 4/7/2017 | 4/7/2017 | 4/7/2017 10:36:18 AM | P | PASS |
|
|
|
ESC16-01082
| Aging Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 10:35:56 AM | | PASS |
|
|
Project complete. okay to final.
|
ESC17-00018
| General Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 10:33:06 AM | P | PASS |
|
|
Stormwater pond excavation is complete. WIP on grading roads and digging utilities for site and Eckert rd. sections of the greenbelt have been removed for construction activity. Some trackout on to greenbelt. No trackout onto surrounding streets. SWPPP inspections are up to date and preformed after the rain event. Notes that repairs are needed for silt fence. Dewatering occurring for utilities occurring on Eckert. All water is discharged on site into the stormwater ponds and land application to site. Clean up is still needed for the original dewatering operation on the west site of the site. There is some sediment build up that should be cleaned. The is material and gravel that should be removed. The gravel check dams need to be removed from adjacent site. Ensure this is complete before grading is complete. No immediate corrections. Activity fees hold still due.
|
ESC15-00556
| General Inspection | 4/3/2017 | 4/7/2017 | 4/7/2017 9:26:07 AM | A | PART |
|
|
Concrete washout maintenance has been performed. Subdivision still has trackout. Sweep trackout.
|
ESC16-00263
| Site Final | 4/7/2017 | 4/7/2017 | 4/7/2017 9:24:07 AM | P | PASS |
|
|
Landscaping complete okay to final
|
ESC16-00263
| Aging Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 9:23:56 AM | | PASS |
|
|
Landscaping complete okay to final
|
ESC16-00216
| Site Final | 4/7/2017 | 4/7/2017 | 4/7/2017 9:22:16 AM | P | PASS |
|
|
|
ESC16-00216
| Aging Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 9:22:01 AM | | PASS |
|
|
Landscaping complete okay to final
|