BLD13-00166
| BLD-Conference | 4/10/2014 | 5/1/2014 | 5/1/2014 4:06:54 PM | A | PEND |
|
|
Follow up on 15 day notice. Moved to 5-2 in the am.
|
BLD13-03540
| BLD-Footing | 5/1/2014 | 5/1/2014 | 5/1/2014 4:06:17 PM | P | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin
|
BLD13-03545
| BLD-Footing | 5/1/2014 | 5/1/2014 | 5/1/2014 4:06:05 PM | P | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin
|
BLD13-03546
| BLD-Footing | 5/1/2014 | 5/1/2014 | 5/1/2014 4:05:54 PM | P | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin
|
BLD13-03547
| BLD-Footing | 5/1/2014 | 5/1/2014 | 5/1/2014 4:05:35 PM | P | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin
|
BLD13-03546
| BLD-Footing | 5/1/2014 | 5/1/2014 | 5/1/2014 4:05:11 PM | P | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin
|
GCB14-00015
| GCB-Shearwall | 4/30/2014 | 5/1/2014 | 5/1/2014 2:49:48 PM | P | FAIL |
|
|
Dan 602.3255. Please provide approved plans. Also provide 5/8type x rock at soffits at 2hr. firewalls. Correction notice posted.
|
GCB14-00016
| GCB-Shearwall | 4/30/2014 | 5/1/2014 | 5/1/2014 2:49:31 PM | P | FAIL |
|
|
Dan 602.3255. Please provide approved plans. Also provide 5/8type x rock at soffits at 2hr. firewalls. Correction notice posted.
|
GCB14-00017
| GCB-Shearwall | 4/30/2014 | 5/1/2014 | 5/1/2014 2:49:06 PM | P | FAIL |
|
|
Dan 602.3255. Please provide approved plans. Also provide 5/8type x rock at soffits at 2hr. firewalls. Correction notice posted.
|
BLD14-00384
| BLD-Other | 5/1/2014 | 5/1/2014 | 5/1/2014 1:59:35 PM | P | FAIL |
|
|
As late as possible please--Above ceiling mechanical inspection please--ROB Phone #: ###-####. No clips installed, electrical inspection above grid not completed.
|
BLD14-00225
| BLD-Framing/Rough-in | 5/1/2014 | 5/1/2014 | 5/1/2014 1:37:15 PM | P | PART |
|
|
jim Phone #: ###-####. No approved plans on site. reviewed plan that was on site and inspected the interior non bearing steel stud walls. ok to on side and insulate only. Contractor to call another framing inspection for friday in the am and will review approved plans prior to cover.
|
BLD14-00224
| BLD-Framing/Rough-in | 5/1/2014 | 5/1/2014 | 5/1/2014 1:36:52 PM | P | PART |
|
|
jim Phone #: ###-####. No approved plans on site. reviewed plan that was on site and inspected the interior non bearing steel stud walls. ok to on side and insulate only. Contractor to call another framing inspection for friday in the am and will review approved plans prior to cover.
|
BLD13-03461
| BLD-Ceiling Grid Inspection | 4/30/2014 | 5/1/2014 | 5/1/2014 12:52:38 PM | P | PART |
|
|
John Phone #: ###-####. Ceiling grid in all areas except dialysis room. Pending trade rough in inspections.
|
BLD13-03541
| BLD-Footing | 5/1/2014 | 5/1/2014 | 5/1/2014 12:46:54 PM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by James Larkin
|
BLD13-03494
| BLD-Final | 5/1/2014 | 5/1/2014 | 5/1/2014 11:54:53 AM | P | NH |
|
|
Thanks Matt, Phone #: ###-#### >> Inspection requested via web by Richard Schultz. Not home and no access to garage.
|
BLD13-01634
| BLD-Framing/Rough-in | 4/30/2014 | 5/1/2014 | 5/1/2014 11:09:33 AM | A | NR |
|
|
This is a interior wall inspection and walk threw so we can start wall top out in area A kitchen studio 1st and 2nd floor The inspection is for ISI Interior Systems Inc. INTERIOR framing contractor on the JUMP project. Please Contact Neil Mays ###-#### for the inspection Phone #: ###-#### >> Inspection requested via web by Jeremy Richardson. Noted that trades are not inspected or completed in these areas. ISI wants to rock from deck down 4ft. 8inch. Suggested to Hoffman to set up a meeting between subs and inspectirs to come up with a phasing plan moving forward.
|
BLD13-00938
| BLD-Conference | 4/30/2014 | 5/1/2014 | 5/1/2014 10:30:45 AM | A | CANC |
|
|
jim - 11am please Phone #: ###-####. Cancelled, rescheduled for friday in the am.
|
BLD14-00549
| BLD-Conference | 4/30/2014 | 5/1/2014 | 5/1/2014 10:25:29 AM | A | DONE |
|
|
darrin Phone #: ###-####. Spoke to contractor about concerns for a draft stop in ceiling. One is already present, but concealed area is less than 3000 s.f.
|
GCB14-00012
| GCB-Framing | 4/30/2014 | 5/1/2014 | 5/1/2014 9:48:06 AM | A | FAIL |
|
|
Mike ###-####. Complete lateral bracing on T7, T10, T12 and T31 trusses. Provide attic access to vaultes ceiling. Squash block below 3ply to versa lam. Strap top plate at masterbath and entry. Provide approved plans, still need wall bracing inspection. Correction notice was posted.
|
GCB13-00131
| GCB-Final | 4/30/2014 | 5/1/2014 | 5/1/2014 8:51:46 AM | A | PASS |
|
|
Mike ###-####. Tempered glazing at mastertub has been installed. Structural final ok.
|
ESC13-00760
| Aging Inspection | 5/1/2014 | 5/1/2014 | | | |
|
|
|