| FIRE-Final Inspection | 5/13/2020 | 5/13/2020 | 5/13/2020 3:57:19 PM | P | FAIL |
|
|
no small documents on site
|
FIR20-00074
| INSP-Sprinkler Rough-in | 5/13/2020 | 5/13/2020 | 5/13/2020 2:55:44 PM | P | PASS |
|
|
Cover for phase 2 hard lid passed. Piping can be covered. Call Jeff with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
FIR20-00131
| INSP-Sprinkler Rough-in | 5/12/2020 | 5/13/2020 | 5/13/2020 2:54:17 PM | P | PASS |
|
|
Underground cover passed. Phone #: ###-#### Inspection requested via web by Brian Carlisle
|
FIR20-00134
| INSP-Sprinkler Rough-in | 5/12/2020 | 5/13/2020 | 5/13/2020 2:51:50 PM | P | PASS |
|
|
Underground cover passed. Phone #: ###-#### Inspection requested via web by Brian Carlisle
|
FIR20-00103
| INSP-Final Inspection | 5/13/2020 | 5/13/2020 | 5/13/2020 1:09:06 PM | P | PASS |
|
|
Permit finaled.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
FIR19-00816
| INSP-Sprinkler Rough-in/Hydro | 5/13/2020 | 5/13/2020 | 5/13/2020 11:57:56 AM | P | PASS |
|
|
Overhead hydro for building 11 tower 4 failed. The other hydros passed. Overhead hydro. Call James before heading out! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR19-00815
| INSP-Sprinkler Rough-in/Hydro | 5/13/2020 | 5/13/2020 | 5/13/2020 11:28:44 AM | P | FAIL |
|
|
Tower 1, left riser/north overhead hydro failed due to visible loss on the guage. The righ hand riser passed. Call James before heading out! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR20-00313
| INSP-Sprinkler Rough-in | 5/12/2020 | 5/13/2020 | 5/13/2020 10:43:23 AM | A | FAIL |
|
|
First and second floors on the east end apartments need additional hangers. Third floor east end apartments need plan mods showing the actual piping routing. No approval for cover.
Gabe Garduno is the contact. This will be a partial Rough-In inspection. Thanks! Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD20-00003
| FIRE-Final Inspection | 5/12/2020 | 5/13/2020 | 5/13/2020 10:01:39 AM | A | FAIL |
|
|
Repair and test exit signs/emergency lights, add exit sign as per plans, remove exit sign from the south west exam room door, the door swing does not match plan near restrooms, the partial wall in the exam room may not provide exit clearance to the exterior door, the installed wall does not match the plans at the exam room.Todd Phone #: ###-####
|
FIR20-00285
| INSP-Sprinkler Rough-in | 5/12/2020 | 5/13/2020 | 5/13/2020 7:15:27 AM | A | PASS |
|
|
Piping above the hard lids is ok for cover.
Kerry Phone #: ###-####
|