ELE18-00106
| Final | 5/16/2018 | 5/16/2018 | 5/16/2018 1:30:33 PM | P | PASS |
|
|
code 4224 Phone #: ###-#### Inspection requested via web by Bob Glenn final ok
|
ELE18-00869
| Electrical Rough-In | 5/16/2018 | 5/16/2018 | 5/16/2018 1:19:39 PM | P | PASS |
|
|
UG cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Underground from Com conduits and 3/4 stubs out of electrical room only ok
|
ELE15-02242
| Permanent Service | 5/15/2018 | 5/16/2018 | 5/16/2018 12:24:57 PM | P | PASS |
|
|
Requesting a Service Insepection on a 100 amp 3 phase 480 volt service. This service was inspected before but Idaho Power is requesting a different type of meterbase than previously installed. Tim ###-#### Phone #: ###-#### Inspection requested via web by Tim Lawrence p/s u/g rec ok
|
ELE18-01835
| Electrical Rough-In | 5/16/2018 | 5/16/2018 | 5/16/2018 12:24:27 PM | P | PASS |
|
|
This is an underground cover inspection. Contact is Rene Ramakers. Phone #: ###-#### Inspection requested via web by Scott Campbell Underground ok to cover
|
ELE18-00932
| Final | 5/15/2018 | 5/16/2018 | 5/16/2018 11:58:33 AM | A | PASS |
|
|
final inspection for B17C 2nd floor restroom remodel. Phone #: ###-#### Inspection requested via web by Steve Moss Final ok
|
ELE18-01830
| Temporary Service | 5/16/2018 | 5/16/2018 | 5/16/2018 10:39:00 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey t/s u/g n ok
|
ELE18-01333
| Permanent Service | 5/16/2018 | 5/16/2018 | 5/16/2018 10:37:09 AM | P | CANC |
|
|
Need an inspection later in the day so Idaho Power will do a reconnnect on service. Contact onsite is Tony newland 208.447.7612 Phone #: ###-#### >> Inspection requested via web by Clint Tate Inspection cancelled from web by: Clint Tate
|
ELE18-00262
| Electrical Rough-In | 5/15/2018 | 5/16/2018 | 5/16/2018 10:14:51 AM | A | PART |
|
|
Start the final process. Von is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen South Nurse call, Xray and Front reception desk not checked at this time. All halls, offices and emergancy lighting OK to final. Von has punch list items. Ready for temp final once reception desk trimmed and tested.
|
ELE18-00262
| Electrical Rough-In | 5/15/2018 | 5/16/2018 | 5/16/2018 10:11:10 AM | A | PASS |
|
|
Wall and ceiling cover. Von is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Front reception area wall and Procedure room Ceiling only ok to cover
|
ELE18-01095
| Final | 5/15/2018 | 5/16/2018 | 5/16/2018 8:40:28 AM | A | CANC |
|
|
Check wiring passing through trusses. ###-####
|
ELE18-01095
| Electrical Rough-In | 5/16/2018 | 5/16/2018 | 5/16/2018 8:40:19 AM | A | FAIL |
|
|
Check wiring passing through trusses. ###-#### Wiring passing through trusses. Re-inspect after engineer addresses issue.
|
ELE18-00262
| Final | 5/15/2018 | 5/16/2018 | 5/15/2018 10:23:13 AM | A | CANC |
|
|
Start the final process. Von is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen
|