PLM17-03297
| PLM-Aging Inspection | 5/18/2018 | 5/18/2018 | 5/21/2018 9:42:48 AM | | PASS |
|
|
finaled under second permit that was pulled.
|
PLM18-01922
| Plumbing Rough-in | 5/17/2018 | 5/18/2018 | 5/18/2018 5:11:54 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM18-02087
| Plumbing Rough-in | 5/18/2018 | 5/18/2018 | 5/18/2018 4:53:41 PM | P | PASS |
|
|
Kevin-rough in cover- and cell number ###-####-lock box in on entry light Phone #: ###-####
|
PLM18-02076
| Plumbing Rough-in | 5/18/2018 | 5/18/2018 | 5/18/2018 4:42:24 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM18-00911
| Groundwork | 5/18/2018 | 5/18/2018 | 5/18/2018 4:33:29 PM | P | PART |
|
|
Need to have you view what I have plumbed so far so I can enclose the floor. Phone #: ###-#### Inspection requested via web by Justin Hone. OK to cover floor. Needs to pressure test after topout is complete
|
PLM18-02081
| Water and/or Sewer | 5/17/2018 | 5/18/2018 | 5/18/2018 4:13:53 PM | P | NR |
|
|
Inspection requested via web by Dereck Cumpton. Spoke to the contractor
|
PLM18-01993
| Water Heater Final | 5/14/2018 | 5/18/2018 | 5/18/2018 4:13:31 PM | P | PASS |
|
|
Please arrive after 2:30pm. please call ###-#### when on way. Phone #: ###-#### Inspection requested via web by JEREMY LINK
|
PLM18-00285
| Final | 5/18/2018 | 5/18/2018 | 5/18/2018 3:43:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
PLM17-04815
| Final | 5/18/2018 | 5/18/2018 | 5/18/2018 3:43:12 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
PLM18-02086
| Sprinkler (Final) | 5/18/2018 | 5/18/2018 | 5/18/2018 3:13:36 PM | P | PASS |
|
|
Backflow prevention inspection Phone #: ###-#### Inspection requested via web by david Fuller
|
PLM18-01952
| Final | 5/17/2018 | 5/18/2018 | 5/18/2018 3:01:55 PM | P | CANC |
|
|
Whole house re-pipe, re-inspection Phone #: ###-#### Inspection requested via web by McKenna Haycock. passed as a rough-in
|
PLM18-01952
| Plumbing Rough-in | 5/18/2018 | 5/18/2018 | 5/18/2018 3:01:34 PM | P | PASS |
|
|
Whole house re-pipe, re-inspection Phone #: ###-#### Inspection requested via web by McKenna Haycock. Rough-in for new bath
|
PLM17-03877
| Med/Gas Systems | 5/18/2018 | 5/18/2018 | 5/18/2018 2:21:42 PM | P | PASS |
|
|
Propane mein repair. Installed a new propane riser on the West end of the highrise tower. The line was damaged by others. Pressure test 80psi
|
PLM17-03261
| Med/Gas Systems | 5/18/2018 | 5/18/2018 | 5/18/2018 2:20:21 PM | P | CANC |
|
|
80psi test ok
|
PLM18-02089
| Water Heater Final | 5/18/2018 | 5/18/2018 | 5/18/2018 1:25:53 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Chris Field
|
PLM17-03926
| DOC - Permit Finaled | 5/18/2018 | 5/18/2018 | 5/18/2018 12:58:59 PM | P | PASS |
|
|
|
PLM17-03093
| Final | 5/18/2018 | 5/18/2018 | 5/18/2018 12:55:18 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-03096
| Final | 5/18/2018 | 5/18/2018 | 5/18/2018 12:54:57 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-03097
| Final | 5/18/2018 | 5/18/2018 | 5/18/2018 12:54:43 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-03281
| Final | 5/18/2018 | 5/18/2018 | 5/18/2018 12:54:29 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-03925
| Final | 5/18/2018 | 5/18/2018 | 5/18/2018 12:54:16 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-03257
| Water and/or Sewer | 5/18/2018 | 5/18/2018 | 5/18/2018 12:54:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-03257
| DOC - Permit Finaled | 5/18/2018 | 5/18/2018 | 5/18/2018 12:53:53 PM | P | PASS |
|
|
|
PLM17-03255
| Water and/or Sewer | 5/18/2018 | 5/18/2018 | 5/18/2018 12:53:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-03255
| DOC - Permit Finaled | 5/18/2018 | 5/18/2018 | 5/18/2018 12:53:29 PM | P | PASS |
|
|
|
PLM18-02059
| Water Heater Final | 5/16/2018 | 5/18/2018 | 5/18/2018 12:02:35 PM | A | PASS |
|
|
Erik Reveal ###-#### Phone #: ###-#### Inspection requested via web by Heidi Lukecart
|
PLM18-02074
| Sprinkler (Final) | 5/17/2018 | 5/18/2018 | 5/18/2018 11:45:07 AM | A | PASS |
|
|
Inspection requested via web by Michael McDonald
|
PLM18-02058
| Water Heater Final | 5/16/2018 | 5/18/2018 | 5/18/2018 11:23:51 AM | A | PASS |
|
|
Jan ; Arthur Bronson ###-#### Phone #: ###-#### Inspection requested via web by Heidi Lukecart
|
PLM18-01989
| Water Heater Final | 5/17/2018 | 5/18/2018 | 5/18/2018 11:06:21 AM | A | PASS |
|
|
9:45; Phone #: ###-####
|
PLM18-02004
| Plumbing Rough-in | 5/17/2018 | 5/18/2018 | 5/18/2018 10:58:46 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Salamon. Pipe t&p to an approved location.
|
PLM17-04703
| Final | 5/18/2018 | 5/18/2018 | 5/18/2018 10:39:07 AM | A | PASS |
|
|
will be ready at 11:00 Phone #: ###-#### Inspection requested via web by jeff flatt
|
PLM18-02071
| Final | 5/17/2018 | 5/18/2018 | 5/18/2018 10:02:21 AM | A | PASS |
|
|
Please call ahead, homeowner contact, Paul ###-#### or Kevin (QHC) @ Phone #: ###-#### Inspection requested via web by Kevin Pratley
|
PLM18-02078
| Water and/or Sewer | 5/17/2018 | 5/18/2018 | 5/18/2018 9:36:36 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Scott Wickstrom. The double check must be certified for a final
|
PLM18-02025
| Water and/or Sewer | 5/17/2018 | 5/18/2018 | 5/18/2018 9:16:51 AM | A | CANC |
|
|
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER Passed as groundwork
|
PLM18-02025
| Groundwork | 5/18/2018 | 5/18/2018 | 5/18/2018 9:16:30 AM | A | PASS |
|
|
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Stub out the water service and 3/4" yard hydrant feed.
|
PLM18-02083
| Groundwork | 5/18/2018 | 5/18/2018 | 5/18/2018 9:15:10 AM | A | PASS |
|
|
Please call when 15-20 mins. away Phone #: ###-#### Inspection requested via web by Pat Falls
|
PLM18-01951
| Water and/or Sewer | 5/17/2018 | 5/18/2018 | 5/17/2018 4:18:03 PM | A | PASS |
|
|
Inspection requested via web by Dan Bastian
|
PLM18-00775
| Plumbing Rough-in | 5/17/2018 | 5/18/2018 | 5/17/2018 2:50:40 PM | P | CANC |
|
|
Door code is 1669 Phone #: ###-#### >> Inspection requested via web by Steve Spence Inspection cancelled from web by: Steve Spence
|