MEC19-01912
| Final | 5/29/2019 | 5/29/2019 | 5/29/2019 3:58:09 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace a/c coil co ok
|
MEC19-02207
| Final | 5/28/2019 | 5/29/2019 | 5/29/2019 3:23:44 PM | P | PASS |
|
|
Please call Josh on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks- furnace a/c coil co ok- 5lb flue test pass
|
MEC19-00989
| Final | 5/29/2019 | 5/29/2019 | 5/29/2019 2:58:59 PM | P | PASS |
|
|
GARAGE CODE 3484 Phone #: ###-#### Inspection requested via web by Oleg Chervak- fireplace and hvac final ok
|
MEC19-02027
| Final | 5/29/2019 | 5/29/2019 | 5/29/2019 2:26:54 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace a/c coil co ok
|
PLM19-02112
| Final | 5/23/2019 | 5/29/2019 | 5/29/2019 1:51:26 PM | P | PASS |
|
|
INSTALLER JAROD ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- water heater final co ok
|
MEC19-02165
| Final | 5/23/2019 | 5/29/2019 | 5/29/2019 1:51:06 PM | P | PASS |
|
|
INSTALLER JAROD ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace a/c coil co ok
|
MEC19-02223
| Rough-in | 5/29/2019 | 5/29/2019 | 5/29/2019 1:28:12 PM | P | PASS |
|
|
Please call Shane @ ###-#### when on the way. Phone #: ###-#### Inspection requested via web by Ashley Shoecraft- fireplace R/I ok
|
MEC18-05413
| Final | 5/29/2019 | 5/29/2019 | 5/29/2019 12:52:48 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Kristy Watson- line set outside at a/c needs uv protection on all arma flex- range hood needs installed- duct blast test needs completed
|
MEC19-01975
| Rough-in | 5/28/2019 | 5/29/2019 | 5/29/2019 12:32:39 PM | P | PASS |
|
|
Greg is the contact Phone #: ###-#### Inspection requested via web by stan lillquist- R/I ok- ok to cover
|
MEC19-00576
| Conference | 5/29/2019 | 5/29/2019 | 5/29/2019 11:15:38 AM | A | PASS |
|
|
duct blast test witness- duct blast test pass
|
MEC19-02205
| Rough-in | 5/28/2019 | 5/29/2019 | 5/29/2019 10:56:18 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart- R/I ok
|
MEC19-02205
| Pressure Test | 5/28/2019 | 5/29/2019 | 5/29/2019 10:56:05 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart- 20lb gas pass tagged meter location
|
MEC19-01473
| Final | 5/24/2019 | 5/29/2019 | 5/29/2019 10:27:29 AM | A | PASS |
|
|
Inspection requested via web by Marisa Hone- furnace a/c coil co ok
|
MEC19-01947
| Pressure Test | 5/29/2019 | 5/29/2019 | 5/29/2019 10:21:40 AM | A | PASS |
|
|
Bj 2085730755 Inspection requested via web by william kerwin- 60lb gas pass whole system- tagged meter location
|
MEC19-01380
| Final | 5/29/2019 | 5/29/2019 | 5/29/2019 10:17:30 AM | A | PASS |
|
|
Bj 2085730755 Inspection requested via web by william kerwin- final ok
|
MEC19-01380
| Card not on site to sign | 5/29/2019 | 5/29/2019 | 5/29/2019 10:17:02 AM | A | PASS |
|
|
Bj 2085730755 Inspection requested via web by william kerwin- no card onsite
|
MEC19-01223
| Rough-in | 5/28/2019 | 5/29/2019 | 5/29/2019 9:50:58 AM | A | PASS |
|
|
last 6 units on 24 plex // Daniel Phone #: ###-####- R/I units 101, 1032, 201, 202, 301 and 302 ok- all 24 units ok to cover
|
MEC19-01953
| Rough-in | 5/28/2019 | 5/29/2019 | 5/29/2019 9:03:24 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves 1- dryer vent exceeds 35' max length 2- need access framed in for outside air for range mau to access damper in attic 3- missing 2 supply ducts in kitchen 4- missing transfer for office 5- w/h flue at zero
left correction n otice front entry window
|
MEC19-01953
| Pressure Test | 5/28/2019 | 5/29/2019 | 5/29/2019 9:01:06 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- 20lb gas pass
|
MEC19-02147
| Final | 5/22/2019 | 5/29/2019 | 5/22/2019 12:52:50 PM | P | CANC |
|
|
INSTALLER JAROD ###-#### Phone #: ###-#### >> Inspection requested via web by Aaron Alandt Inspection cancelled from web by: Aaron Alandt
|