BLD19-01063
| BLD-Final | 5/7/2019 | 5/8/2019 | 5/8/2019 4:20:07 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD19-01063
| DOC - Permit Finaled | 5/8/2019 | 5/8/2019 | 5/8/2019 4:19:57 PM | P | PASS |
|
|
All work appeard to be done in accordance with local codes and ordinances.
|
BLD19-00980
| BLD-Final | 5/7/2019 | 5/8/2019 | 5/8/2019 3:36:51 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD19-00980
| DOC - Permit Finaled | 5/8/2019 | 5/8/2019 | 5/8/2019 3:36:41 PM | P | PASS |
|
|
All work appeared to be done in acordance with local codes and ordinances.
|
BLD19-00318
| BLD-Wall Bracing | 5/8/2019 | 5/8/2019 | 5/8/2019 3:07:00 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD18-03934
| BLD-Energy code compliance | 5/7/2019 | 5/8/2019 | 5/8/2019 2:49:29 PM | P | PASS |
|
|
for garage // Steve Phone #: ###-####
|
BLD18-03934
| BLD-Framing/Rough-in | 5/7/2019 | 5/8/2019 | 5/8/2019 2:49:18 PM | P | PASS |
|
|
Steve Phone #: ###-####. Framing in basement ok.
|
BLD19-00632
| BLD-Framing/Rough-in | 5/8/2019 | 5/8/2019 | 5/8/2019 2:38:46 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Rustin Ray. Install A2.5 on A1 thru A5 trusses. Nail 2ply C3 trusses per the engineering. Provide approved fixes for A6 and A7 trusses. Nail of hangars on E3 and E4 trusses. Tempered glazing required at windows next to soaker tub and shower/tub. Correction notice posted. OK to insulate.
|
BLD19-00242
| BLD-Framing/Rough-in | 5/7/2019 | 5/8/2019 | 5/8/2019 10:17:46 AM | A | PASS |
|
|
David Phone #: ###-####
|
BLD18-00632
| BLD-Framing/Rough-in | 5/7/2019 | 5/8/2019 | 5/8/2019 9:40:26 AM | A | PASS |
|
|
Hi Mike,,, west single story hard lids for cover Phone #: ###-#### Inspection requested via web by Jim Carriveau
|
BLD19-00368
| BLD-Framing/Rough-in | 5/7/2019 | 5/8/2019 | 5/8/2019 9:18:34 AM | A | PASS |
|
|
Rick Phone #: ###-####. Inteior steel stud framed walls and soffit ok. Pending electrical and plumbing rough in inspections.
|
BLD19-00095
| BLD-Ceiling Grid Inspection | 5/7/2019 | 5/8/2019 | 5/8/2019 8:58:38 AM | A | NR |
|
|
early morning preference Phone #: ###-#### Inspection requested via web by Adam Joslin. Needs lelctrical and mech inspections first.
|
BLD19-01064
| BLD-Final | 5/7/2019 | 5/8/2019 | 5/8/2019 8:58:10 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Michael La Pointe
|
BLD19-01064
| DOC - Permit Finaled | 5/8/2019 | 5/8/2019 | 5/8/2019 8:58:01 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|