FIR18-00094
| INSP-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 3:22:55 PM | A | FAIL |
|
|
Todays inspection was for the 4th floor. See the city approved plans for all devices tested and the corrections needed such as Room Number/device address corrections. The general alarm silence feature does not function yet. The fire smoke dampers are not accessible for inspection.
Randy Phone #: ###-####
|
NAF18-00061
| INSP-Sprinkler Rough-in | 6/21/2018 | 6/21/2018 | 6/21/2018 3:13:24 PM | P | CANC |
|
|
Rescheduled for tomorrow morning
Call prior to going Phone #: 2084774515 >> Inspection requested via mobile web by Jeremiah Robinson
|
FIR18-00045
| INSP-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 3:10:55 PM | A | CANC |
|
|
The duct detector housing issue has not been resolved.
Contact is Sean. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
BLD18-00870
| FIRE-Final Inspection | 5/31/2018 | 6/21/2018 | 6/21/2018 10:58:43 AM | A | FAIL |
|
|
Need city approved plans, need annual inspection for the fire extinguisher and verification of annual inspection for the fire sprinkler system.
Jessica Phone #: ###-####
|
FIR18-00405
| INSP-Sprinkler Rough-in | 6/20/2018 | 6/21/2018 | 6/21/2018 8:57:30 AM | A | PASS |
|
|
Rough-in passed. Piping is ok for cover.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
BLD17-03723
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 8:56:58 AM | A | PASS |
|
|
Life safety passed
Joe Phone #: ###-####
|
BLD18-01795
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 8:50:35 AM | A | FAIL |
|
|
Need annual inspection for the fire extinguisher and the door hardware installed
Tim Phone #: ###-####
|
BLD17-02017
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 8:16:31 AM | P | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD17-01937
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 8:16:11 AM | A | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD17-02006
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 8:15:48 AM | A | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD17-02017
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 8:14:45 AM | A | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD17-02016
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 8:14:21 AM | A | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD17-02015
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 8:13:52 AM | A | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD17-02014
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 8:13:33 AM | A | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD17-02013
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 8:13:13 AM | A | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD17-02012
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 8:12:44 AM | A | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD17-02011
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 8:12:23 AM | A | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD17-02010
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 8:12:03 AM | A | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD17-02009
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 8:11:42 AM | A | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD17-02008
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 7:58:25 AM | A | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD17-02007
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 7:58:02 AM | A | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD17-02018
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 7:53:48 AM | A | PASS |
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
FIR18-00441
| INSP-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 7:48:48 AM | A | PASS |
|
|
Permit finaled
As early as possible Phone #: 2089411846 >> Inspection requested via mobile web by SVC Brian A
|
BLD18-02125
| FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 7:48:02 AM | A | PASS |
|
|
Life safety passed
Jennifer Phone #: ###-####
|