ESC14-00212
| General Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 4:16:02 PM | | PASS |
|
|
No trackout, discharges, or fugitive dust at site. Interior work is ongoing.
Still need to pay fee for reinspection charge issued due to numerous discharge investigations.
|
ESC13-00930
| DOC - Permit Finaled | 6/23/2015 | 6/23/2015 | 6/23/2015 4:02:17 PM | P | PASS |
|
|
|
ESC13-00930
| General Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 4:01:42 PM | | PASS |
|
|
Mansion remodel and addition is complete, landscaped and stabilized. No ongoing construction or remaining disturbed areas. ESC permit conditions satisfied. Permit finaled.
|
ESC14-01124
| General Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 3:01:14 PM | | PASS |
|
|
Home near completion. Partially landscaped, construction complete. Need to remove porta pot and temp BMPs after landscaping/stabization is complete. No violations observed.
|
ESC15-00556
| General Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 2:51:10 PM | P | PASS |
|
|
Grubbing and initial grading activity has been finished on the east side of the East Valley phase 2 project. No activity at time of inspection.
No trackout from site access points, no wind blown dust observed, no discharges or materials contained/stored at site.
Approved, no corrections at this time.
|
ESC15-00674
| Site Preparation | 6/22/2015 | 6/23/2015 | 6/23/2015 2:48:20 PM | P | PASS |
|
|
Clint Phone #: ###-####
East Valley BMPs and active are in compliance with permit conditions. Washout has remaining capacity. Approved for construction.
|
ESC15-00023
| BMP Violation | 6/19/2015 | 6/23/2015 | 6/23/2015 2:28:20 PM | A | FAIL |
|
|
Reisnpect for corrections.
Appears that no corrections were conducted since initial notice on Thursday 6/19
2nd Correction Notice - written notice posted and VM left for Rustin Ray.
Corrections: 1. Post yellow ESC permit sign with contact details 2. Clean up sidewalk and gutter (mud and dirt) 3. Install BMPs per ESC site plan 4. Provide trash container 5. Empty and maintain DI bag
Corrections due by Friday 6/26 or potential SWO.
|
ESC14-00608
| General Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 1:54:18 PM | | PASS |
|
|
Work on stormwater pond is now complete. SFHs in progress by Hunter and Tahoe Homes. DIs have sediment bags.
|
ESC12-00130
| General Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 11:39:05 AM | | PASS |
|
|
River Heights strcuture is compete. Painting crews and electricians are on site. No trackout from construction entrances. Greenbelt vegetation, silt fencing, and construction fencing have remained installed/undisturbed for length of project. No fugitive dust issues. Checked MS4 discharge point in Boise River for the Lusk area and there was no flow or issues occuring.
Approved.
|
ESC14-00239
| General Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 11:36:28 AM | | PASS |
|
|
Building shell for the Vista West apartment complex is complete and exterior painting, interior work, sidewalks and curbing, and irrigation are in progress. Streets are free of significant amounts of dirt and no muddy trackout. No washout or liquid spills observed on site or in proximity of MS4 DIs, which have sediment filter bags installed.
WIP. No corrections at this time.
|
ESC15-00015
| General Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 10:34:12 AM | P | PASS |
|
|
Lots are graded and ready for building. No SFH activity occuring yet. Neighborhood BMPs in good condition. Streets and gutters are free of loose sediment or debris. No corrections at this time.
|
ESC15-00018
| Aging Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 10:16:15 AM | | PASS |
|
|
Work complete. Site stabilized. No loose sediment or materials on or around site. Permit conditions met. Permit finaled.
|
ESC15-00018
| DOC - Permit Finaled | 6/23/2015 | 6/23/2015 | 6/23/2015 10:15:00 AM | P | PASS |
|
|
|
ESC14-00484
| Aging Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 10:08:29 AM | | PASS |
|
|
WIP. Foundation is poured. No sediment leaving site, permit signed clearly posted. No loose trash or litter. Clean site, no corrections needed.
|
ESC14-01120
| General Inspection | 6/23/2015 | 6/23/2015 | 6/23/2015 9:59:06 AM | | PASS |
|
|
|
ESC15-00331
| Site Preparation | 6/22/2015 | 6/23/2015 | 6/23/2015 9:52:55 AM | A | PASS |
|
|
9:30 AM site prep requested by Lach
ESC site prep meeting and walk through conducted with PC maintenance.
Work area contained within parking lot. Sandbag check bags will be installed on the gutter on Collister (east branch) to capture any sediment or dirt. Dirt is mostly sand and pit run rock so will not easily transport.
Work to be completed next week. Permit posted. Trash container for employees to be provided. Approved for work.
|
ESC15-00755
| Site Preparation | 6/22/2015 | 6/23/2015 | 6/23/2015 9:22:11 AM | A | PASS |
|
|
Jake-would like to meet as early as possible and could you please call them with a meet time Phone #: ###-####
Met homeower RP-GC onsite. Silt fence installed to protect small surface irrigation ditch.
Permit posted on front window. Existing vegetation will be preserved other than new garage footprint.
Approved for construction.
|