FIR19-00437
| INSP-Final Inspection | 6/25/2019 | 6/25/2019 | 6/25/2019 7:11:52 PM | P | CANC |
|
|
Duplicate inspection request.
9 pm // Phone #: ###-####
|
FIR19-00437
| INSP-Final Inspection | 6/25/2019 | 6/25/2019 | 6/25/2019 7:11:22 PM | P | PASS |
|
|
Final hood suppression system inspection complete.
after hours // Nate Phone #: ###-####
|
FIR18-00302
| INSP-Final Inspection | 6/25/2019 | 6/25/2019 | 6/25/2019 4:27:07 PM | P | CANC |
|
|
No inspection performed for this permit due to time constraints, this request is cancelled per conversation with point of contact.
Dillon Phone #: ###-####
|
FIR18-00301
| INSP-Final Inspection | 6/25/2019 | 6/25/2019 | 6/25/2019 4:26:52 PM | P | CANC |
|
|
No inspection performed for this permit due to time constraints, this request is cancelled per conversation with point of contact.
Please call Dillion Barresi with Stock Construcion Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
FIR18-00300
| INSP-Final Inspection | 6/25/2019 | 6/25/2019 | 6/25/2019 4:26:25 PM | P | CANC |
|
|
No inspection performed for this permit due to time constraints, this request is cancelled per conversation with point of contact.
Please call Dillion Barresi with Stock Construction ###-#### Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
FIR18-00180
| INSP-Final Inspection | 6/25/2019 | 6/25/2019 | 6/25/2019 4:26:08 PM | P | CANC |
|
|
No inspection performed for this permit due to time constraints, this request is cancelled per conversation with point of contact.
Please call Dillion Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
FIR18-00001
| INSP-Final Inspection | 6/25/2019 | 6/25/2019 | 6/25/2019 4:23:32 PM | P | FAIL |
|
|
Dillon has the city approved drawings that have been notated, numerous areas has no sway bracing, sway bracing is shown on the city approved drawings, sway bracing needs to be installed or removed from the city approved drawings. Numerous heads under duct work and piping has been added but the approved drawings do not reflect the install. City approved drawings have been notated where corrections need to be made.
Dillon Phone #: ###-####
|
FIR19-00439
| INSP-Final Inspection | 6/25/2019 | 6/25/2019 | 6/25/2019 2:10:12 PM | A | PASS |
|
|
Final fire sprinkler inspection for area of work complete.
adam chitwood Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
FIR19-00439
| INSP-Sprinkler Rough-in | 6/25/2019 | 6/25/2019 | 6/25/2019 2:09:42 PM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
adam chitwood Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
NAF19-00019
| INSP-Sprinkler Rough-in | 6/25/2019 | 6/25/2019 | 6/25/2019 1:41:12 PM | P | PART |
|
|
Tenting inspection for east side tenant space complete, all tenting in place for east side tenant at time of inspection, east side tenant space approved for cover.
Call prior to going Phone #: 2089148171 >> Inspection requested via mobile web by Brian
|
FIR19-00400
| INSP-Sprinkler Rough-in | 6/25/2019 | 6/25/2019 | 6/25/2019 1:15:47 PM | P | PASS |
|
|
Rough in inspection for area of work complete, cover approved.
Tom Phone #: ###-####
|
FIR19-00242
| INSP-Final Inspection | 6/24/2019 | 6/25/2019 | 6/25/2019 12:33:07 PM | A | FAIL |
|
|
Notated city approved drawings where sound level requirements were not met per NFPA72. Need to add an A/V device in notated area on city approved drawings. Audio visual devices throughout went out of sync during inspection.
Please call 30 minutes prior. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
FIR19-00321
| INSP-Sprinkler Rough-in/Hydro | 6/25/2019 | 6/25/2019 | 6/25/2019 11:34:36 AM | P | FAIL |
|
|
Piping installed does match city approved drawings. Overspaced hangers on level 1. System held 200 psi for hydrostatic test but if changes need to be made to match city approved drawings then a re-hydro will be required. Head in level 3 bedroom is to close to heat register, need 24 inchs off of heat registers with 13D.
Plans are stuffed in riser drain valve Phone #: ###-#### Inspection requested via web by Jessia Maxwell
|
BLD18-00248
| FIRE-Final Inspection | 6/24/2019 | 6/25/2019 | 6/25/2019 10:48:51 AM | A | PASS |
|
|
No fire sprinklers, no fire alarms. Final life fire safety inspection for area of work complete.
Wes Phone #: 208-###-####
|
BLD17-04464
| FIRE-Final Inspection | 6/24/2019 | 6/25/2019 | 6/25/2019 10:47:41 AM | A | PASS |
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags, knox box is located by fire sprinkler riser room. Final life fire safety inspection complete.
Wes Phone #: 208-###-####
|
FIR19-00394
| INSP-Sprinkler Rough-in | 6/25/2019 | 6/25/2019 | 6/25/2019 10:16:18 AM | P | PASS |
|
|
Rough to cover inspection for remaining undergorund complete, approved for cover.
The rest of the underground cover Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
BLD19-00682
| FIRE-Final Inspection | 6/24/2019 | 6/25/2019 | 6/25/2019 9:27:30 AM | A | PASS |
|
|
Previously noted items have been corrected, suite number will be installed before BLD final. Fire sprinkler inspection complete, fire alarm inspection is complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
John Phone #: ###-####
|
FIR19-00364
| INSP-Final Inspection | 6/24/2019 | 6/25/2019 | 6/25/2019 9:25:55 AM | A | PASS |
|
|
Final fire sprinkler inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
BLD19-00872
| FIRE-Final Inspection | 6/25/2019 | 6/25/2019 | 6/25/2019 9:05:11 AM | A | PASS |
|
|
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.
|
FIR19-00327
| INSP-Sprinkler Rough-in | 6/24/2019 | 6/25/2019 | 6/25/2019 9:03:04 AM | A | FAIL |
|
|
No tenting installed and no one working on tenting at time of inspection, cover is not approved.
Colton Cox is the contact for this inspection. The RTC and Hydro inspections were already passed. We are just needing inspection and approval for tinting insulation. Thank you for your help. Have a good day. Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00374
| INSP-Sprinkler Rough-in | 6/24/2019 | 6/25/2019 | 6/25/2019 8:43:17 AM | A | FAIL |
|
|
Numerous hangers/straps need to be added, need to add hangers where required, stopped inspection on level 1 after multiple apartments requiring additional straps.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00340
| INSP-Final Inspection | 6/24/2019 | 6/25/2019 | 6/24/2019 4:50:12 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
FIR19-00447
| INSP-Final Inspection | 6/24/2019 | 6/25/2019 | 6/24/2019 4:12:01 PM | A | CANC |
|
|
Contact is Dan. Phone #: ###-#### >> Inspection requested via web by Morgan Ahten Inspection cancelled from web by: Morgan Ahten
|