Inspections for the day of: Monday, June 4, 2018.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR17-00771 INSP-Sprinkler Rough-in/Hydro6/4/20186/4/20186/4/2018 3:44:12 PMPPART
24 hour air test started at 3:40 with pressure as marked on guage.
FIR18-00351 INSP-Sprinkler Rough-in6/4/20186/4/20186/4/2018 3:22:42 PMPPASS
See the city approved plans for areeas marked "ok" where piping can be covered. I noted a missing lateral brace on the new main.
FIR16-00708 INSP-Final Inspection5/31/20186/4/20186/4/2018 3:03:51 PMPFAIL
Today was a partial inspection. See Lee's entry for items tested.


Ray McQueen, inspecting technician, building is open for access Phone #: ###-#### Inspection requested via web by Rose Peterson
BLD17-02018 FIRE-Final Inspection6/1/20186/4/20186/4/2018 2:50:56 PMPFAIL
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)

Steve Phone #: ###-####
BLD17-02017 FIRE-Final Inspection6/1/20186/4/20186/4/2018 2:50:35 PMPFAIL
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)

Steve Phone #: ###-####
BLD17-02013 FIRE-Final Inspection6/1/20186/4/20186/4/2018 2:50:16 PMPFAIL
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)

Steve Phone #: ###-####
BLD17-02007 FIRE-Final Inspection6/1/20186/4/20186/4/2018 2:49:57 PMPFAIL
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)

Steve Phone #: ###-####
BLD17-02016 FIRE-Final Inspection6/1/20186/4/20186/4/2018 2:49:37 PMPFAIL
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)

Steve Phone #: ###-####
BLD17-02008 FIRE-Final Inspection6/1/20186/4/20186/4/2018 2:49:15 PMPFAIL
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)

Steve Phone #: ###-####
BLD17-02015 FIRE-Final Inspection6/1/20186/4/20186/4/2018 2:48:56 PMPFAIL
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)

Steve Phone #: ###-####
BLD17-02009 FIRE-Final Inspection6/1/20186/4/20186/4/2018 2:48:35 PMPFAIL
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)

Steve Phone #: ###-####
BLD17-02014 FIRE-Final Inspection6/1/20186/4/20186/4/2018 2:48:09 PMPFAIL
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)

Steve Phone #: ###-####
BLD17-02012 FIRE-Final Inspection6/1/20186/4/20186/4/2018 2:47:47 PMPFAIL
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)


Steve Phone #: ###-####
BLD17-02011 FIRE-Final Inspection6/1/20186/4/20186/4/2018 2:47:19 PMPFAIL
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)

Steve Phone #: ###-####
BLD17-02010 FIRE-Final Inspection6/1/20186/4/20186/4/2018 2:46:53 PMPFAIL
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)

Steve Phone #: ###-####
BLD17-01937 FIRE-Final Inspection6/1/20186/4/20186/4/2018 2:46:29 PMPFAIL
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)

Steve Phone #: ###-####
BLD17-02006 FIRE-Final Inspection6/1/20186/4/20186/4/2018 2:46:01 PMPFAIL
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)

Steve Phone #: ###-####
FIR18-00411 INSP-Sprinkler Rough-in6/1/20186/4/20186/4/2018 1:43:58 PMPCANC
Tenting is not done yet. To be rescheduled for tomorrow afternoon per Colton.

Colton Cox is the contact for this inspection. He is requesting a rough-in for the next 6 units. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00129 INSP-Sprinkler Rough-in/Hydro6/1/20186/4/20186/4/2018 1:02:04 PMACANC
Rescheduled for tomorrow morning.

Contact Andrew Larson ###-#### 30 min prior to Hydro Test start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
BLD17-00426 FIRE-Final Inspection6/1/20186/4/20186/4/2018 11:13:33 AMAFAIL
Need the sticker put on the correct side of the main exit and a racking permit is still needed for the storage racking over 8'

call 20 minutes before to meet // Gayle Phone #: ###-####
FIR18-00277 INSP-Final Inspection6/1/20186/4/20186/4/2018 10:44:37 AMAPASS
Permit finaled

Brian Phone #: ###-####
NAF17-00036 INSP-Final6/1/20186/4/20186/4/2018 10:23:22 AMAFAIL
Provide address, tag for fire extinguisher and the city approved plans

Call prior to going Phone #: 2088806778 >> Inspection requested via mobile web by Caleb
FIR18-00326 INSP-Final Inspection6/3/20186/4/20186/4/2018 10:00:21 AMAFAIL
For todays inspection I went through equipment and verified notification device spacing. The candella needs to be changed on several devices and atleast two devices added. We need to test the notification circuit, sprinkler devices and duct smoke detectors. As-builts will be needed as well.

Phone #: ###-#### Inspection requested via web by Nathan Price
NAF18-00038 INSP-Final6/1/20186/4/20186/4/2018 9:56:58 AMADONE
Life safety passed. Correction made.

Call prior to going Phone #: 2087132042 >> Inspection requested via mobile web by Ryan
FIR13-00187 INSP-Final Inspection5/29/20186/4/20186/4/2018 7:26:28 AMAFAIL
No school disctrict personnell showed up to provide acces. No inspection was performed.


Bora HS final Phone #: ###-#### Inspection requested via web by Shane Lesteberg