BLD18-02537
| BLD-Final | 7/1/2019 | 7/1/2019 | 7/1/2019 3:48:36 PM | P | FAIL |
|
|
David Phone #: ###-####. Provide home envelope test report and post results. (blower doortest). Disconnect fan for condition crawl.(Under floor is insulated and not the perimeter stemwall and foundation vents have been installed.
|
BLD18-02802
| BLD-Concrete | 7/1/2019 | 7/1/2019 | 7/1/2019 3:29:09 PM | P | PASS |
|
|
2nd 1/2 pourback Phone #: ###-#### Inspection requested via web by Todd Landvatter
|
BLD18-04079
| BLD-Final | 6/27/2019 | 7/1/2019 | 7/1/2019 1:36:22 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin.. Mech. final has failed.
|
BLD19-00729
| BLD-Wall cover | 7/1/2019 | 7/1/2019 | 7/1/2019 1:35:20 PM | P | PASS |
|
|
Please call Mark Stevens half hour before arriving at ###-####. All insulation in garage and house is complete. There are some additional interior walls receiving insulation for sound barrier but I wanted to have everything inspected prior to the interior wall cavity was filled. All additional air sealing locations have been filled per Inspectors direction. Inspection requested via web by Mark Fischer. Ok to sheet rock.
|
BLD19-00973
| BLD-Footing | 6/24/2019 | 7/1/2019 | 7/1/2019 10:28:11 AM | A | PASS |
|
|
We would like to request inspection as late in the A.M as possible 11:00 -11:30? Thank you! Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
|
BLD19-00977
| BLD-Conference | 7/1/2019 | 7/1/2019 | 7/1/2019 9:54:36 AM | A | DONE |
|
|
|
BLD19-00872
| BLD-Final | 6/28/2019 | 7/1/2019 | 7/1/2019 8:41:37 AM | A | PASS |
|
|
John- please call for access Phone #: ###-####. All issues resolved. Ok for perm occ.
|