MEC18-03298
| Final | 7/11/2018 | 7/11/2018 | 7/11/2018 4:26:31 PM | P | PASS |
|
|
Francis will call inspector when done. Inspection requested via web by Floyd Floyd Peek
|
MEC18-03282
| Rough-in | 7/10/2018 | 7/11/2018 | 7/11/2018 3:38:00 PM | P | FAIL |
|
|
r/i and p/t -- Les Phone #: ###-#### need approved manual J on site for roughin inspection, flash shield fittings not installed per manufactures instalation instructions, need approve striker plates, gas flex cannot be fastened to wall studs
|
MEC18-03297
| Final | 7/11/2018 | 7/11/2018 | 7/11/2018 3:11:40 PM | P | PASS |
|
|
PLEASE CALL OUR LEAD INSTALLER JONAH WHEN 30 MINS IN ROUTE, LATER AFTERNOON WORKS BEST FOR US IF THAT WORKS WITH YOUR SCHEDULE- 3-5P Phone #: ###-#### Inspection requested via web by Rick Montgomery
|
MEC18-03286
| Final | 7/11/2018 | 7/11/2018 | 7/11/2018 2:50:48 PM | P | PASS |
|
|
Please call on way: Maddie ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss
|
MEC18-03122
| Rough-in | 7/11/2018 | 7/11/2018 | 7/11/2018 2:42:23 PM | P | PASS |
|
|
Call manny 20 min ahead Phone #: ###-#### Inspection requested via web by Manuel Canto
20 lb gas and rough in
|
MEC18-03292
| Pressure Test | 7/11/2018 | 7/11/2018 | 7/11/2018 1:26:06 PM | P | PASS |
|
|
60 lb test okay
|
MEC18-03292
| Final | 7/11/2018 | 7/11/2018 | 7/11/2018 1:25:45 PM | P | PASS |
|
|
60 lb test
|
MEC18-02888
| Final | 7/10/2018 | 7/11/2018 | 7/11/2018 1:13:01 PM | P | PASS |
|
|
PLEASE CALL OWNER MIKE @ # LISTED WHEN EN ROUTE FOR FINAL INSPECTION. PLEASE COME BETWEEN 1-2 P.M. OR BETWEEN 3-5 P.M. Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING
|
MEC18-03229
| Rough-in | 7/11/2018 | 7/11/2018 | 7/11/2018 12:56:02 PM | P | PASS |
|
|
duct blaster test at 12:00 rough in inspection pressure test. Please call with any questions or concerns. Thank you Jennifer Phone #: ###-#### Inspection requested via web by ted roy 20 lb gas 5lb flue rough in and blast test okay
|
MEC18-03292
| Pressure Test | 7/10/2018 | 7/11/2018 | 7/11/2018 11:17:36 AM | A | PART |
|
|
Please call one half hour head to meet at jobsite. Phone #: ###-#### Inspection requested via web by Rene Neumeyer 20lb test okay, 60lb test needs tobe on 100lb gauge
|
MEC18-03253
| Rough-in | 7/10/2018 | 7/11/2018 | 7/11/2018 11:13:41 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero
|
MEC18-01942
| Final | 7/9/2018 | 7/11/2018 | 7/11/2018 10:40:59 AM | A | FAIL |
|
|
Call Jason with any issues @ 412.6696 Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek range hood not installed
|
MEC18-03264
| Pressure Test | 7/10/2018 | 7/11/2018 | 7/11/2018 9:50:25 AM | A | PASS |
|
|
PLEASE CALL HOMEOWNER JOE WHEN 30 MINS IN ROUTE Phone #: ###-#### Inspection requested via web by Rick Montgomery 20lb gas
|
MEC18-03264
| Final | 7/11/2018 | 7/11/2018 | 7/11/2018 9:50:07 AM | P | PASS |
|
|
PLEASE CALL HOMEOWNER JOE WHEN 30 MINS IN ROUTE Phone #: ###-#### Inspection requested via web by Rick Montgomery
|
MEC18-02900
| Final | 7/10/2018 | 7/11/2018 | 7/11/2018 9:12:01 AM | A | PASS |
|
|
PLEASE CALL HOMEOWNER JOE @ # LISTED WHEN EN ROUTE Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING
|
MEC17-02140
| Mec-Aging Inspection | 7/11/2018 | 7/11/2018 | 7/11/2018 8:52:24 AM | | CANC |
|
|
|
MEC18-02766
| Final | 7/10/2018 | 7/11/2018 | 7/11/2018 8:51:32 AM | A | PASS |
|
|
The customer would like their inspection as close to 8:30AM as possible please. His name is Ron ###-####. Phone #: ###-#### Inspection requested via web by Krista Boss
|
MEC18-03229
| Pressure Test | 7/9/2018 | 7/11/2018 | 7/11/2018 8:16:36 AM | A | CANC |
|
|
Duct blaster test 9:00am rough in inspection fireplace and gas pressure Phone #: ###-#### >> Inspection requested via web by ted roy Inspection cancelled from web by: ted roy
|
MEC18-03229
| Rough-in | 7/9/2018 | 7/11/2018 | 7/11/2018 8:16:34 AM | A | CANC |
|
|
Duct blaster test 9:00am rough in inspection fireplace and gas pressure Phone #: ###-#### >> Inspection requested via web by ted roy Inspection cancelled from web by: ted roy
|
MEC18-03254
| Pressure Test | 7/9/2018 | 7/11/2018 | 7/10/2018 11:13:50 AM | P | CANC |
|
|
We are installing the furnace and coil in the morning please call Eric D at ###-#### to coordinate. Phone #: ###-#### >> Inspection requested via web by Sabrina DeHority Inspection cancelled from web by: Sabrina DeHority
|
MEC18-03254
| Final | 7/9/2018 | 7/11/2018 | 7/10/2018 11:13:48 AM | P | CANC |
|
|
We are installing the furnace and coil in the morning please call Eric D at ###-#### to coordinate. Phone #: ###-#### >> Inspection requested via web by Sabrina DeHority Inspection cancelled from web by: Sabrina DeHority
|