ESC18-01124
| Conference | 7/11/2019 | 7/11/2019 | 7/12/2019 11:03:00 AM | P | PASS |
|
|
Talked to Cameron and said they'd get it taken care off.
|
ESC16-00225
| General Inspection | 7/11/2019 | 7/11/2019 | 7/12/2019 11:02:32 AM | | PASS |
|
|
No new activity at site.
|
ESC18-00467
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 2:36:24 PM | | PART |
|
|
Everything contained up on lot.
|
ESC19-00076
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 2:36:08 PM | P | PASS |
|
|
Masons getting ready to do block walls. Most workers parking in school lot in front of building. Two stabalized entrances, no trackout. Will need to watch for blowing styrofoam insulation during construction.
|
ESC19-00443
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 2:35:02 PM | P | PART |
|
|
WIP on framing. Site contained no issues
|
ESC16-01395
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 2:34:39 PM | | CANC |
|
|
|
ESC18-01182
| Site Final | 7/11/2019 | 7/11/2019 | 7/11/2019 12:09:22 PM | P | NR |
|
|
Still needs landscaping.
|
ESC19-00412
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 12:03:06 PM | P | PASS |
|
|
Site is contained by vegetative buffer. No loose or blowing trash.
|
ESC18-01227
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 11:51:16 AM | | PASS |
|
|
No new construction activity. Parking lot finished, area starting to overgrow.
|
ESC18-01390
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 11:34:34 AM | P | PART |
|
|
All work is interior or roofing. Trash boxes have been picked up, small trash around site needs to be cleaned. No major issues.
|
ESC18-00828
| Site Final | 7/11/2019 | 7/11/2019 | 7/11/2019 10:57:53 AM | P | NR |
|
|
Landscaping not finished, not stabalized.
|
ESC18-00427
| Site Final | 7/8/2019 | 7/11/2019 | 7/11/2019 10:51:53 AM | P | NR |
|
|
Not landscaped. Building completed.
|
ESC18-01045
| Aging Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 10:39:53 AM | | PASS |
|
|
No disturbances. Area around home is gravel driveway.
|
ESC19-00303
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 10:21:01 AM | P | PASS |
|
|
Side dumps hauling in fill and grader working site. Some light dust. Workers parked across street, all trackout being cleaned up.
|
ESC19-00304
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 10:19:58 AM | P | PASS |
|
|
Few drill rigs working on site. Area mostly being used for parking for workers. Water has been used to keep dust down, no trackout.
|
ESC18-00900
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 10:14:08 AM | P | PASS |
|
|
Giant trencher on site. Some dust from work on far south of site. SOme dirt on road apron, no trackout onto road.
|
ESC19-00432
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 10:06:10 AM | P | CANC |
|
|
|
ESC19-00432
| DOC - Permit Finaled | 7/11/2019 | 7/11/2019 | 7/11/2019 10:06:04 AM | P | PASS |
|
|
|
ESC19-00527
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 10:05:21 AM | P | PASS |
|
|
WIP. All material on lot, neighborhood washout installed. No issues.
|
ESC18-00988
| Site Final | 7/11/2019 | 7/11/2019 | 7/11/2019 10:03:57 AM | P | PASS |
|
|
|
ESC19-00466
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 10:03:04 AM | P | PASS |
|
|
Home is framed, no esc issues.
|
ESC18-01788
| Site Final | 7/11/2019 | 7/11/2019 | 7/11/2019 10:02:15 AM | P | PASS |
|
|
|
ESC18-01128
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 9:55:31 AM | P | PASS |
|
|
Site is contained, no ESC issues.
|
ESC18-00760
| General Inspection | 7/11/2019 | 7/11/2019 | 7/11/2019 9:46:15 AM | | PASS |
|
|
New washout on site. All stormwater leads to onsite retention. Large stockpiles on site. No dirt leaving site.
|
ESC18-00943
| Site Final | 7/5/2019 | 7/11/2019 | 7/10/2019 9:42:57 AM | A | PASS |
|
|
|
ESC18-00949
| Site Final | 7/5/2019 | 7/11/2019 | 7/10/2019 9:41:03 AM | A | PASS |
|
|
|
ESC18-00938
| Site Final | 7/5/2019 | 7/11/2019 | 7/10/2019 9:38:59 AM | P | PASS |
|
|
|