Inspections for the day of: Wednesday, July 15, 2020.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTell Riley
TitleBLD-COM/RES INSPECTOR
Phone #830-2752
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-00326 BLD-Aging Inspection7/15/20207/15/20207/17/2020 7:06:46 AM PEND
MIS19-00211 MIS-Aging Inspection7/15/20207/15/20207/17/2020 7:06:25 AM DONE
BLD19-03266 BLD-Aging Inspection7/15/20207/15/20207/17/2020 7:05:26 AM PEND
BLD18-02533 BLD-Aging Inspection7/15/20207/15/20207/17/2020 7:04:57 AM PEND
no request for inspection
BLD20-00088 BLD-Final7/15/20207/15/20207/15/2020 4:02:12 PMPPASS
SCREENED // Eric Phone #: ###-####//R38 in attic, ok as window U values are .29 and lower for all glass//R21 in walls//final complete//
BLD20-00088 DOC - Permit Finaled7/15/20207/15/20207/15/2020 4:01:04 PMPPASS
BLD20-00088 BLD-Blower Door Test Results7/15/20207/15/20207/15/2020 4:00:47 PMPDONE
5.9 ACH 50
BLD20-01282 BLD-Footing7/14/20207/15/20207/15/2020 3:45:36 PMPPART
screened - nobody is living here // Pat Phone #: ###-####//need to double check setbacks on wall inspection//they will have strings pulled for verification//rebar installed per plans///
BLD20-00344 BLD-Ceiling Grid Inspection7/15/20207/15/20207/15/2020 3:09:23 PMPPART
screened // Miles Phone #: ###-####//phase one grid areas//mech passed//Fire sprinkler passed//ok to flood grid in areas of phase one that electrical has passed//other areas are pending eletrical approval//
BLD19-04651 BLD-Conference7/15/20207/15/20207/15/2020 2:55:20 PMPDONE
call if needed- damon *screened* Phone #: ###-####//questions on steps//step at garage/dwelling separation door need to be even height risers--currently 6,6 and 4//landing at front egress door needs to be min 36" in direction of travel//
BLD19-04369 BLD-Footing7/15/20207/15/20207/15/2020 1:59:36 PMPPART
Serigo *screened* Phone #: ###-####//SOUTH WALL FOOTINGS CLOUDED ON PLANS DATED 6/22/2020 THAT ARE NOT APPROVED PLANS, CONTRACTOR POURING AT OWN RISK UNTIL PLAN MODIFICATION IS SUBMITTED AND APPROVED//REBAR IN THIS LOCATION APPEARS TO BE INSTALLED PER THESE PLANS//areas outside modified footings are ok per the APPROVED plans//advised contractor PLAN MODIFICATION MUST BE APPROVED PRIOR TO GOING VERTICAL WITH FRAMING//maintain all clearances on rebar//
BLD19-04013 BLD-Energy code compliance7/15/20207/15/20207/15/2020 1:12:58 PMPPART
SCREENED // Matt Phone #: ###-####//3rd set of 6 from east end//2 top units still need tenting inspection//other 4 units appear to be ok//
BLD20-01807 BLD-Other7/14/20207/15/20207/15/2020 11:12:19 AMACANC
Underground gas inspection on gas line between meter and future pool equipment location Phone #: ###-#### Inspection requested via web by Monica McNair//this isnpection needs to be completed under a Mechanical permit for the gas line//
BLD20-01278 BLD-Energy code compliance7/13/20207/15/20207/15/2020 11:04:16 AMAPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD20-01281 BLD-Energy code compliance7/13/20207/15/20207/15/2020 11:03:53 AMAPASS
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD20-01563 BLD-Wall Bracing7/14/20207/15/20207/15/2020 10:10:01 AMAPART
screened // Christina Phone #: ###-####//discrepancy on plans for Braced wall line B//need to add portal frame and possibly hold down//bracing in one location is perforated with window and brace does not meet requirements//provide fix from designer for code comlaince of wall bracing//all other areas outside braced wall line B ok//
BLD20-00917 BLD-Footing7/14/20207/15/20207/15/2020 9:29:12 AMAPART
call for access- Larry *screened* Phone #: ###-####//footings ok per engineers RFI due to site condtions//front porch footings appear to meet 24" frost depth and have a footing under the stoop//maintain clearances on rebar prior to pour//
BLD20-01397 BLD-Framing/Rough-in7/14/20207/15/20207/15/2020 8:56:11 AMAFAIL
Gabe, *screened* Shop not connected to home Phone #: ###-####//Correction notice issued for framing corrections//truss issues need to be addressed and new engineering provided to reflect the installation and modification that was completed onsite//
BLD19-00530 BLD-Aging Inspection7/15/20207/15/20207/15/2020 8:21:42 AM PASS
WIP on all buildings in project
BLD19-03157 BLD-Aging Inspection7/15/20207/15/20207/15/2020 8:21:09 AM CANC
MIS19-00213 MIS-Aging Inspection7/15/20207/15/20207/15/2020 8:20:57 AM DONE
MIS19-00213 DOC - Permit Finaled7/15/20207/15/20207/15/2020 8:20:47 AMPPASS
ELE issue//notes show permit was pulled and issues are resolved//