Inspections for the day of: Tuesday, July 23, 2019.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMichael Zawacki
TitleEROSION INSPECTOR
Phone #208-473-8333
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01669 Site Final7/16/20197/23/20197/24/2019 10:20:57 AMPPASS
ESC18-01312 General Inspection7/23/20197/23/20197/23/2019 2:12:42 PM PASS
Site is bare but contained, below sidewalk grade out front. Rear has trash box and is clean.
ESC17-00315 General Inspection7/23/20197/23/20197/23/2019 12:38:02 PM PASS
No new activity, weeds have been knocked down.
ESC16-00935 General Inspection7/23/20197/23/20197/23/2019 12:15:12 PM PEND
Driveway has been cut out and being evaluated by soils engineer. Some saw cutting slurry has gone down drain and bubbled up below, some also has gone out drain into hillside. Talked with RP and will see what ACHD wants done and if they need to vac out drains. Broken concrete is currently in road.
ESC18-01171 General Inspection7/23/20197/23/20197/23/2019 11:57:31 AM PASS
Workers installing drainage rock and tiles over rock. Old concrete washout needs to be cleaned up and removed.
No major issues at site.
ESC18-00917 Aging Inspection7/23/20197/23/20197/23/2019 11:42:35 AM PASS
All work contained to backyard, front is stabalized.
ESC18-01300 General Inspection7/23/20197/23/20197/23/2019 11:31:12 AM PASS
No visible disturbances, did not go through gate to back.
ESC15-00853 General Inspection7/23/20197/23/20197/23/2019 11:24:41 AM PASS
WIP on one unit.
Site is clean, materials being stored om bottom lots, no dirt on road
ESC17-01287 General Inspection7/23/20197/23/20197/23/2019 11:03:41 AM PASS
Area has been cleaned up, still needs stabalization.
ESC17-01009 General Inspection7/23/20197/23/20197/23/2019 10:43:03 AM PASS
Site is clean and contained.
Fence crew on site, will need to be careful to not build in trash box.
ESC18-01284 General Inspection7/23/20197/23/20197/23/2019 10:25:20 AM PASS
No workers on site.
Uphill side my cause issues if not stabalized before rain starts.
ESC18-01550 General Inspection7/23/20197/23/20197/23/2019 10:07:49 AMPPASS
Capitol paving and gas company both on site. Looks like driveway is being prepped, lot bare. Nothing leaving site.