ELE18-02683
| Electrical Rough-In | 7/24/2018 | 7/24/2018 | 7/24/2018 2:18:27 PM | P | PASS |
|
|
Corbin ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Up bathrooms only rough in ok cover
|
ELE17-02183
| Final | 7/24/2018 | 7/24/2018 | 7/24/2018 1:58:29 PM | P | FAIL |
|
|
Call Mike with questions, he should be at the house. Phone #: ###-#### Inspection requested via web by Bonnie Page 210.8- Receptacles located with in 6' of kitchen sink shall have GFCI protection. 210.8- Receptacles located in bathrooms shall have GFCI protection, up bath stool. 314.25- All boxes shall have covers in place. 408.4- Panels circuit directories shall be complete.
|
ELE18-02011
| Final | 7/23/2018 | 7/24/2018 | 7/24/2018 12:04:15 PM | A | PASS |
|
|
Please call Lynn prior to arrival. Thank you! Phone #: ###-#### Inspection requested via web by Lynn Proctor No card posted. Final ok
|
ELE18-02790
| Conference | 7/23/2018 | 7/24/2018 | 7/24/2018 10:34:21 AM | A | DONE |
|
|
We will be on site all day. Phone #: ###-#### Inspection requested via web by Casey Fouts Discussed clearance requirements for electric service from a gas meter. As per notes on Idaho Power website a minimum of 36" distance in all directions from gas meter. Once 36" is done a horizontal distance of 18" shall be satisfied.
|
ELE18-02007
| Final | 7/23/2018 | 7/24/2018 | 7/24/2018 9:56:23 AM | A | FAIL |
|
|
No one on site. Homeowner and general contractor know you will be coming. Call with any questions. Phone #: ###-#### Inspection requested via web by Garrett Collins 410.16- Luminaire located in closet shall have a totally enclosed lamp.
|
ELE18-02792
| Conference | 7/23/2018 | 7/24/2018 | 7/24/2018 9:38:04 AM | A | DONE |
|
|
We were quoted for the electrical work by our contractor''s electrician and decided to try and save money by doing it ourselves. We had already roughed in a portion and completed the pendant lights when our contractor saw what we were doing and asked if we had pulled our permit. We didn''t realize we needed one! So we stopped what we were doing, cleaned up the mess, and filed our permit and would like guidance to ensure we are in compliance with the law. Phone #: ###-#### Inspection requested via web by Michael Hobson Discussed wiring of addition, minimum receptacle locations, boxfill, amount of wire in a box, type of receptacles, outdoor receptacle needed, listing of materials. Inspection process. Pamphlet given.
|
ELE18-02791
| Electrical Rough-In | 7/23/2018 | 7/24/2018 | 7/24/2018 9:05:19 AM | A | PASS |
|
|
2nd floor bathrooms, are ready for rough in inspection. Bathrooms are open and can be inspected any time. I am not on site, but call with any needed info. Kurt ###-#### Phone #: ###-#### Inspection requested via web by Kurt Carlson Bathrooms Rough in ok cover
|