FIR17-00392
| INSP-Conference | 8/11/2017 | 8/11/2017 | 8/11/2017 2:36:08 PM | P | DONE |
|
|
Per my conversation with Scott Arellano, additional manual pull stations will not be required.
|
FIR17-00236
| INSP-Final Inspection | 8/11/2017 | 8/11/2017 | 8/11/2017 2:10:54 PM | P | PASS |
|
|
Permit finaled
|
FIR17-00426
| INSP-Final Inspection | 8/11/2017 | 8/11/2017 | 8/11/2017 1:27:12 PM | P | FAIL |
|
|
As-builts are needed showing all of the audio/visual devices and the accurate location of all devices. Coverage needs to be modified in two corridors and coverage provided in the other half of the Conference Room.
|
BLD17-01278
| FIRE-Final Inspection | 8/11/2017 | 8/11/2017 | 8/11/2017 1:08:57 PM | P | FAIL |
|
|
Need the project related fire alarm permit finaled. Need to repair the two exit signs and provide two exit signs in the Break Room. Need panic hardware installed in Break Room. Need additional emergency lighting in the Open Office area. Need fire extinguishers provided.
|
BLD17-01397
| FIRE-Final Inspection | 8/11/2017 | 8/11/2017 | 8/11/2017 1:07:15 PM | P | PASS |
|
|
Life safety passed
|
BLD17-02603
| FIRE-Final Inspection | 8/9/2017 | 8/11/2017 | 8/11/2017 11:20:43 AM | A | PASS |
|
|
Life safety passed
|
FIR17-00365
| INSP-Sprinkler Rough-in | 8/10/2017 | 8/11/2017 | 8/11/2017 9:28:04 AM | A | PASS |
|
|
The piping for the remote FDC has the tape installed and can be covered.
|
NAF17-00023
| INSP-Final | 8/9/2017 | 8/11/2017 | 8/11/2017 9:27:34 AM | A | FAIL |
|
|
Repair the retaining straps, provide the calc sticker and provide the updated approved drawings for the earthquake bracing locations
|
NAF17-00050
| INSP-Sprinkler Rough-in/Hydro | 8/9/2017 | 8/11/2017 | 8/11/2017 9:26:35 AM | A | FAIL |
|
|
Provide block off plate for the outlet at FACP, provide testing of the duct smoke detectors, provide one bell that functions correctly at the FDC
Call prior to going Phone #: 8418763 >> Inspection requested via mobile web by Matt
|
BLD17-01371
| FIRE-Final Inspection | 8/10/2017 | 8/11/2017 | 8/11/2017 7:56:13 AM | A | PART |
|
|
Phase B (North East Quadrant) life safety is passed. Will need the door mag request to exit buttons modified
temp occ // Jason Phone #: ###-####
|