Inspections for the day of: Thursday, August 16, 2018.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-02224 FIRE-Final Inspection8/16/20188/16/20188/16/2018 3:38:53 PMPPASS
life safety passed

Steve Phone #: ###-####
FIR18-00298 INSP-Sprinkler Rough-in8/15/20188/16/20188/16/2018 1:48:20 PMPCANC
To be rescheduled when ceiling tile has been removed

Contact Scott Powada ###-#### 30 min prior to RTC Insp Start please, he would like to schedule at the same time as the UG RTC.

Thanks Phone #: ###-#### Inspection requested via web by Teri Cruickshank
FIR18-00284 INSP-Sprinkler Rough-in/Hydro8/16/20188/16/20188/16/2018 1:47:02 PMPPASS
The underground hydro test passed
FIR18-00059 INSP-Final Inspection8/16/20188/16/20188/16/2018 1:30:12 PMPFAIL
As-builts are needed to show the two strobes that need their candella adjusted higher and the manual pull station that has been deleted. Several strobes I could not see the candella setting due to height and no ladder. No actual testing performed. Will need to be re-scheduled after as-builts are approved.


Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
FIR18-00284 INSP-Sprinkler Rough-in8/15/20188/16/20188/16/2018 12:58:12 PMPCANC
Contact Scott Powada ###-#### 30 min prior to UG RTC Insp start please, we''ve scheduled a OH RTC insp for the same afternoon please con-inside.

Thanks Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
FIR18-00548 INSP-Sprinkler Rough-in/Hydro8/15/20188/16/20188/16/2018 11:09:26 AMAPART
overhead hydro for the 2nd, 3rd and FDC passed. 1st floor failed due to leak.


Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00411 INSP-Sprinkler Rough-in/Hydro8/15/20188/16/20188/16/2018 11:08:43 AMAPASS
overhead Hydro for the 1st, 2nd, 3rd and FDC passed.

Phone #: ###-#### Inspection requested via web by Stan Beus
FIR18-00219 INSP-Final Inspection8/14/20188/16/20188/16/2018 10:39:38 AMAPASS
Permit finaled
BLD18-01922 FIRE-Final Inspection8/15/20188/16/20188/16/2018 9:40:06 AMACANC
Fire/Life/Safety Final Phone #: ###-#### Inspection requested via web by Travis Myers
FIR18-00548 INSP-Sprinkler Rough-in8/15/20188/16/20188/16/2018 9:24:10 AMAPASS
Rough to cover for the piping in the soffits passed.

Phone #: ###-#### Inspection requested via web by Stan Beus