FIR12-00717
| INSP-Sprinkler Rough-in | 8/22/2013 | 8/22/2013 | 8/22/2013 3:48:28 PM | P | PASS |
|
|
See the city approved plans for locations in the Emergency Room where piping can be covered.
|
BLD12-03211
| FIRE-Final Inspection | 8/21/2013 | 8/22/2013 | 8/22/2013 3:47:45 PM | A | PASS |
|
|
Life safety passed. One fire door was having problems latching and was in the process of being repaired and one additional emergency light is needed in the second floor breezeway. These items were going to be shown to the building inspector.
|
FIR13-00184
| INSP-Final Inspection | 8/22/2013 | 8/22/2013 | 8/22/2013 3:46:02 PM | P | PASS |
|
|
Permit finaled
|
FIR13-00182
| INSP-Final Inspection | 8/22/2013 | 8/22/2013 | 8/22/2013 3:43:08 PM | P | PASS |
|
|
permit finaled
|
BLD13-01457
| FIRE-Final Inspection | 8/22/2013 | 8/22/2013 | 8/22/2013 12:50:33 PM | P | PASS |
|
|
life safety passed
|
BLD13-01894
| FIRE-Final Inspection | 8/22/2013 | 8/22/2013 | 8/22/2013 12:22:41 PM | P | PASS |
|
|
Life safety passed
|
FIR13-00382
| INSP-Final Inspection | 8/21/2013 | 8/22/2013 | 8/22/2013 10:39:01 AM | A | PASS |
|
|
permit finaled
|
BLD13-01375
| FIRE-Final Inspection | 8/20/2013 | 8/22/2013 | 8/22/2013 10:37:53 AM | A | PASS |
|
|
Life safety passed
|
FIR13-00419
| INSP-Final Inspection | 8/21/2013 | 8/22/2013 | 8/22/2013 10:37:25 AM | A | PASS |
|
|
Permit finaled
|