Inspections for the day of: Thursday, August 22, 2019.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-03155 Rough-In Permanent Service8/22/20198/22/20198/22/2019 2:43:00 PMPFAIL
Phone #: ###-#### Inspection requested via web by Greg Traudt...
1) NMB shall have minimum of 1/4" of sheathing were entering a box...multiple locations in violation...ceiling and walls
ELE07-02082 ELE-Aging Inspection8/22/20198/22/20198/22/2019 2:36:02 PM PASS
still under construction...permit reopened as per Bob Archibald 8/21/19
ELE19-00136 Final8/22/20198/22/20198/22/2019 2:34:55 PMPPASS
All new electrical gear is installed, equipment is connected and in operation. Call with any questions. Kurt ###-#### Phone #: ###-#### Inspection requested via web by Kurt Carlson...labelling of breakers, AFI label, and new feeds into/out existing and new panel complete
ELE19-02494 Electrical Rough-In8/22/20198/22/20198/22/2019 1:41:26 PMPPASS
EQ bonding plane wiring ; connections Phone #: ###-#### Inspection requested via web by Lars Johnson...ok to cover
ELE19-02905 Electrical Rough-In8/22/20198/22/20198/22/2019 1:05:06 PMPNR
Nick Harris is contact at ###-####. Underground Inspection. Phone #: ###-#### Inspection requested via web by Debby Pierce..
spoke to contact...inspection needed for following Monday PM...rescheduled for 8/26/19
ELE19-02751 Conference8/22/20198/22/20198/22/2019 12:27:18 PMPDONE
disconnect, light and outlet in attic...was informed by mechanical inspector that HVAC unit was installed in attic and required electrical needed for servicing of equipment was not installed...verify at final that done
ELE19-02507 Final8/21/20198/22/20198/22/2019 11:33:32 AMAPASS
Call Matt Butler prior to going to site 503 309 1453 Inspection requested via web by Matt Phillips...ok to final...work done thru wall/surface
ELE19-02698 Final8/22/20198/22/20198/22/2019 11:05:23 AMAPASS
Equipment is connected and energized, panel schedule has been redone, breaker lock offs installed at panel. Call with any questions.
Kurt ###-#### Phone #: ###-#### Inspection requested via web by Kurt Carlson..ok to final
ELE19-02902 Electrical Rough-In8/21/20198/22/20198/22/2019 10:44:00 AMAFAIL
Whole house and service Phone #: ###-#### Inspection requested via web by David McClellan...

**as per permit ELE19-01739..house accross street...UF wire installedwith no inspection...needs addressed**

1) all wires shall have a connector or attachment where enters box...bell box side of house...lot #108 and #113 accross street
2) 12/2 NMB and 14/2 NMB in same box and feeding a completed circuit...unable to verify circuit size and location in panel
3) nail plates required...mst bed switches and back door in dining...top plate
4) stack-it used to support/strap 8/3 NMB...exceeds manufacturers rating...12 and 14 NMB only
5) all metal boxes shall be grounded...LV panel
ELE19-03104 Electrical Rough-In8/21/20198/22/20198/22/2019 9:26:30 AMAPASS
fireplace rough-in inspection Phone #: ###-#### Inspection requested via web by Kevin Perez....rough complete...ok to cover
ELE19-02732 Final8/21/20198/22/20198/21/2019 10:26:45 AMAPASS
Call me Barry Spencer with any questions. ###-#### Phone #: ###-#### Inspection requested via web by Rob Maes...
labelling, disconnect, and OCPD ok